Hill of Snowy Slack (22 MW wind farm)
Hill of Snowy Slack is a 22 MW wind farm project in Aberdeenshire, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 9 May 2006; the record was last updated on 9 May 2006.
22 MWwind farm
application withdrawnstatus in REPD
9 May 2006record last updated
Aberdeenshirecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 25 January 2005 | Application submitted |
| 9 May 2006 | Application withdrawn |
Project details
- Technology
- wind farm
- Capacity
- 22 MW
- Status (REPD)
- application withdrawn
- Record last updated
- 9 May 2006
- Operator or applicant
- Npower Renewables
- Planning authority
- Aberdeenshire
- Planning application reference
- M/APP/2004/4603
- Turbines
- 11
- Address (REPD)
- At Kil Drummuie Mr Lumbersdone
- Council area (by location)
- Aberdeenshire
- REPD reference
- 3544
Who decides
| Applications | Aberdeenshire | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 200 | 10,236 |
| Refused | 64 (32%) | 19% |
| Solar refused | 1 of 40 | 12% |
| Onshore wind refused | 60 of 132 | 45% |
| Battery storage refused | 3 of 28 | 16% |
| Median time from submission to decision | 40.6 weeks | 17.0 weeks |
| Appeals lodged / allowed | 15 / 13 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Tibberchindy Wind Farm | wind farm | 18 | refused | 6.8 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (57.2565, -2.9071).