Hyndburn Wind Farm Extension (8.2 MW)

Hyndburn Wind Farm Extension is an 8.2 MW wind farm project in Hyndburn, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 26 June 2015, not yet built; the record was last updated on 10 February 2026. REPD records the planning permission as expiring on 26 June 2018, but the project holds a Contracts for Difference award (AR7a), so construction may have started. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

8.2 MWwind farm
approved, not builtmay be out of datestatus in REPD
10 February 2026record last updated
Hyndburncouncil area

REPD records the planning permission as expiring on 26 June 2018, but the project holds a Contracts for Difference award (AR7a), so construction may have started.

Planning timeline

DateStage
7 July 2014Application submitted
26 June 2015Planning permission granted
26 June 2018Permission expired

Project details

Technology
wind farm
Capacity
8.2 MW
Status (REPD)
approved, not built
Record last updated
10 February 2026
Operator or applicant
Energiekontor UK
Planning authority
Hyndburn
Planning application reference
11/14/0244
Turbines
4
Turbine height
122 m
Address (REPD)
Land at Oswaldtwistle Moor Off B6236, Haslingden Road, Accrington
Council area (by location)
Hyndburn
Time to decision
51 weeks
Contracts for Difference
AR7a
REPD reference
4384

Who decides

ApplicationsHyndburnUK
Decided applications (solar, wind, battery)1810,236
Refused1 (6%)19%
Solar refused0 of 1412%
Onshore wind refused0 of 245%
Battery storage refused1 of 216%
Median time from submission to decision10.6 weeks17.0 weeks
Appeals lodged / allowed0 / 1—

UK: all UK planning authorities. Counted under these REPD planning authority names: Hyndburn, Hyndburn Borough.

Other large projects within 10 km

ProjectTypeMWStatuskm
Hyndburn Wind Farmwind farm24operational0.6
Ramsclough Farm, Haslingden Old Road Solar Farmsolar farm26.4application submitted1.0
Knuzden Moss Farm, Oswaldtwistlebattery storage60approved, not built4.1
Davies Road - Whitebirk Battery Storagebattery storage25approved, not built5.6
Huncoat Power Stationbattery storage45refused7.4
Hameldon Hill extensionwind farm7.5operational7.8
Rochdale Road, Edenfieldbattery storage85refused7.8
Hameldon Hill Wind Farm (extension 2)wind farm7.1permission expired8.1
Shuttleworth House, Higher Shuttleworthbattery storage100refused8.2

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.7187, -2.3846).