Land at Lower House Farm (8.1 MW solar farm)

Land at Lower House Farm is an 8.1 MW solar farm project in Monmouthshire, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 21 March 2016; the record was last updated on 27 May 2016.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

8.1 MWsolar farm
operationalstatus in REPD
27 May 2016record last updated
Monmouthshirecouncil area

Planning timeline

DateStage
8 August 2012Application submitted
10 December 2012Planning permission granted
1 February 2016Construction started
21 March 2016Operational

Project details

Technology
solar farm
Capacity
8.1 MW
Status (REPD)
operational
Record last updated
27 May 2016
Operator or applicant
3C Energy
Planning authority
Monmouthshire
Planning application reference
DC/2012/00666
Address (REPD)
Land at Lower House Farm, Kemeys Commander, Usk
Council area (by location)
Monmouthshire
Time to decision
18 weeks
REPD reference
5006

Who decides

ApplicationsMonmouthshireUK
Decided applications (solar, wind, battery)1210,236
Refused2 (17%)19%
Solar refused2 of 1212%
Median time from submission to decision19.1 weeks17.0 weeks
Appeals lodged / allowed2 / 2—

Other large projects within 10 km

ProjectTypeMWStatuskm
Mamhilad Solar Farmsolar farm5operational4.1
Penpergwm Solar Farm (Great House Farm)solar farm32under construction7.3
Land East of Panteg Waysolar farm5abandoned7.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.7342, -2.9459).