Maesgwyn solar farm (7.5 MW)

Maesgwyn solar farm is a 7.5 MW solar farm project in Neath Port Talbot, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 15 February 2017; the record was last updated on 22 May 2017.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

7.5 MWsolar farm
operationalstatus in REPD
22 May 2017record last updated
Neath Port Talbotcouncil area

Planning timeline

DateStage
5 August 2014Application submitted
28 May 2015Planning permission granted
1 December 2016Construction started
15 February 2017Operational

Project details

Technology
solar farm
Capacity
7.5 MW
Status (REPD)
operational
Record last updated
22 May 2017
Operator or applicant
Walters Group
Planning authority
Neath Port Talbot
Planning application reference
P2014/0762
Site area
24.6 ha
Address (REPD)
Land East of Maesgwyn Wind Farm Glynneath Neath
Council area (by location)
Neath Port Talbot
Time to decision
42 weeks
REPD reference
2215

Who decides

ApplicationsNeath Port TalbotUK
Decided applications (solar, wind, battery)3810,236
Refused10 (26%)19%
Solar refused0 of 1212%
Onshore wind refused10 of 2345%
Battery storage refused0 of 316%
Median time from submission to decision57.9 weeks17.0 weeks
Appeals lodged / allowed4 / 3—

UK: all UK planning authorities. Counted under these REPD planning authority names: Neath Port Talbort, Neath Port Talbot.

Other large projects within 10 km

ProjectTypeMWStatuskm
Maesgwyn Wind Farm - extension (Phase 2)wind farm7permission expired3.2
Hendre Fawr Farmsolar farm11.6operational3.5
Maesgwynwind farm26operational4.2
Bryngolwg Farm, Hirwaun Solar farmsolar farm8.9operational5.2
Cefn Farm, Mount Roadbattery storage200application submitted5.6
Rhigos Road Solar Farmsolar farm9.9under construction5.9
Hirwaun Stor Generationbattery storage21.8operational6.1
Dulais Valleywind farm13.5refused6.7
Hirfynyddwind farm18refused on appeal7.4

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.7658, -3.6212).