Poplar Lane Wind Farm (14 MW)

Poplar Lane Wind Farm is a 14 MW wind farm project in Shropshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on appeal on 15 July 2009; the record was last updated on 6 December 2010.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

14 MWwind farm
refused on appealstatus in REPD
6 December 2010record last updated
Shropshirecouncil area

Planning timeline

DateStage
1 April 2008Application submitted
2 September 2008Refused by the planning authority
15 July 2009Appeal refused

Project details

Technology
wind farm
Capacity
14 MW
Status (REPD)
refused on appeal
Record last updated
6 December 2010
Operator or applicant
Nuon Renewables
Planning authority
Shropshire
Planning application reference
08/00831/EIA
Appeal reference
08/00831/EIA
Turbines
7
Address (REPD)
North Shropshire midway between the villages of Woore and Norton in Hales.
Council area (by location)
Shropshire
Time to decision
22 weeks
REPD reference
3059

Who decides

ApplicationsShropshireUK
Decided applications (solar, wind, battery)9810,236
Refused22 (22%)19%
Solar refused20 of 7812%
Onshore wind refused2 of 345%
Battery storage refused0 of 1716%
Median time from submission to decision15.2 weeks17.0 weeks
Appeals lodged / allowed10 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
Maer Hills Wind Farmwind farm8abandoned5.5
Hatherton Lodgesolar farm8.3permission expired7.3
Hatherton Lodge Farm, Hunsterson Road Solar Farmsolar farm12.5approved, not built7.9
Hollins Lanebattery storage13approved, not built9.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.9576, -2.4175).