Wind farm at Rivox Wind Farm Lowther Hills West Of Moffat (208 MW)

Wind farm at Rivox Wind Farm Lowther Hills West Of Moffat is a 208 MW wind farm project in Dumfries and Galloway, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 10 July 2023, no decision recorded; the record was last updated on 16 July 2021. As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

208 MWwind farm
application submittedmay be out of datestatus in REPD
16 July 2021record last updated
Dumfries and Gallowaycouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
10 July 2023Application submitted

Project details

Technology
wind farm
Capacity
208 MW
Status (REPD)
application submitted
Record last updated
16 July 2021
Operator or applicant
Belltown Power Limited
Planning authority
Scottish Government (S36)
Planning application reference
ECU00003293
Turbines
29
Turbine height
230 m
Address (REPD)
Rivox Wind Farm Lowther Hills West Of Moffat
Council area (by location)
Dumfries and Galloway
Name in REPD
Rivox Wind Farm - Wind farm
REPD reference
9317

The scheme also includes 90 MW of battery storage, recorded separately in REPD (application submitted).

Who decides

As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. Scottish Government (S36) refused 18% of 334 decided solar, wind and battery applications in REPD (median 127 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Lowther Hills (North Lowther Energy Initiative)wind farm147refused on appeal6.3
Harryburn Wind Farmwind farm67refused on appeal8.0
Leadhills Wind Farmwind farm49refused8.3
Elvanfoot, Leadhills Road - Phase 3 - BESSbattery storage25application submitted8.6
Watchman Energy Parkwind farm91application submitted8.6
Watchman Energy Parkbattery storage50application submitted8.6
Leadhills Road, Elvanfoot Phase 2battery storage49.9application submitted8.7
Wind Turbines at Herds Hill Wind Farmwind farm10.3application submitted8.7
Elvanfoot, Leadhills Roadbattery storage9.8approved, not built8.7

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.3844, -3.7603).