Wind Turbines at Herds Hill Wind Farm (10.3 MW)

Wind Turbines at Herds Hill Wind Farm is a 10.3 MW wind farm project in Dumfries and Galloway, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 30 November 2023, no decision recorded; the record was last updated on 21 December 2023. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

10.3 MWwind farm
application submittedmay be out of datestatus in REPD
21 December 2023record last updated
Dumfries and Gallowaycouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
30 November 2023Application submitted

Project details

Technology
wind farm
Capacity
10.3 MW
Status (REPD)
application submitted
Record last updated
21 December 2023
Operator or applicant
Drumbuie Renewables
Planning authority
Dumfries and Galloway
Planning application reference
23/2572/FUL
Turbines
3
Turbine height
149 m
Address (REPD)
Herds Hill Wind Farm, Sanquhar
Council area (by location)
Dumfries and Galloway
Name in REPD
Herds Hill Wind Farm - Wind Turbines
REPD reference
13249

Who decides

ApplicationsDumfries and GallowayUK
Decided applications (solar, wind, battery)10610,236
Refused40 (38%)19%
Solar refused1 of 1812%
Onshore wind refused33 of 7245%
Battery storage refused6 of 1616%
Median time from submission to decision60.9 weeks17.0 weeks
Appeals lodged / allowed19 / 17—

Other large projects within 10 km

ProjectTypeMWStatuskm
Twentyshilling Hill Wind Farmwind farm37.8under construction3.7
Sandy Knowe Wind Farm Extensionwind farm21.6approved, not built4.6
Cloud Hill Wind Farmwind farm56approved, not built7.0
Ulziesidewind farm40abandoned7.3
Rowancraig North Wind Farmwind farm36application submitted7.4
Lowther Hills (North Lowther Energy Initiative)wind farm147refused on appeal7.7
Spango Community Wind Farmwind farm49application withdrawn7.7
Spango Community Wind Farmwind farm49refused7.9
Wind farm at Rivox Wind Farm Lowther Hills West Of Moffatwind farm208application submitted8.7

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.3517, -3.8852).