Energy Projects Near You

Solar, wind and battery projects near Folkestone (CT18)

3 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of CT18 (Folkestone and Hythe): 2 approved but not yet running, 1 operational. The largest live scheme is Bowles Well Gardens (0.8 MW rooftop solar, approved on 26 August 2022, not yet built), 4.2 km away. Offshore, 2 wind farms are recorded within 40 km; the nearest is Kentish Flats 2 (49.5 MW, operational), 37.5 km away. Source: Renewable Energy Planning Database, July 2026 extract.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

3projects within 10 km
0awaiting a decision
2approved, not running
1operational

Projects within 10 km of CT18

Smaller schemes under 1 MW, mostly rooftop solar (3)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Martello House, Shearway Roadrooftop solarrooftop solar0.2approved, not builtupdated Apr 2026Dec 2025granted Jan 2026Apr 2026Folkestone and Hythe2.3
Morrisons Store 148 Cheriton Roadrooftop solarrooftop solar0.3operationalupdated Dec 2021Nov 2021granted Mar 2022Dec 2021Folkestone and Hythe3.5
Bowles Well Gardensrooftop solarrooftop solar0.8approved, not builtupdated Aug 2022Jul 2022granted Aug 2022Aug 2022Folkestone and Hythe4.2

Distance from the average position of the CT18 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.

By type

TypeAllPendingApprovedOperationalRefusedMW in pipeline
Rooftop solar302101

MW in pipeline: pending, approved and under-construction capacity.

Offshore wind farms within 40 km

Wind farmMWStatus (REPD)km
Kentish Flats 249.5operationalupdated Jun 201637.5
Kentish Flats90operationalupdated Oct 201738.5

Operational, approved and pending offshore wind farms; distance from the district centre to the REPD grid reference of each wind farm (one point per site, so the nearest turbines can be closer or further). All offshore wind farms in UK waters.

How Folkestone and Hythe decides solar, wind and battery applications

Folkestone and Hythe has 9 decided solar, wind or battery applications in REPD — too few for a refusal rate (we show one from 10 decisions). Across all UK planning authorities 19% of 10,236 decisions were refusals.

All projects in Folkestone and Hythe

Is the status up to date?

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Check the council's planning register for the latest decision.