Energy Projects Near You

Solar, wind and battery projects near Crickhowell (NP8)

6 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of NP8 (Powys): 1 is waiting for a planning decision, 4 approved but not yet running. The largest live scheme is Rassau Industrial Estate, Rassau (8 MW battery storage, approved on 24 July 2023, not yet built; REPD status may be out of date), 8.7 km away. Source: Renewable Energy Planning Database, July 2026 extract.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

6projects within 10 km
1awaiting a decision
4approved, not running
0operational

Projects within 10 km of NP8

Projects of 1 MW and more (4)

ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Rassau Industrial Estatebattery storagebattery storage6under constructionupdated Jan 2022Nov 2019granted Jan 2020Jan 2022Blaenau Gwent8.5
Rassau Industrial Estatewind turbinewind turbine1.5approved, not built may be out of dateupdated Sep 2019Oct 2018granted Jul 2019Sep 2019Blaenau Gwent8.5
Rassau Industrial Estate, Rassaubattery storagebattery storage8approved, not built may be out of dateupdated Sep 2023Mar 2023granted Jul 2023Sep 2023Blaenau Gwent8.7
Mynydd James Wind Farmwind farmwind farm31.2application withdrawnupdated Oct 2005Jul 2006—Oct 2005Blaenau Gwent9.2
Smaller schemes under 1 MW, mostly rooftop solar (2)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Rassau Industrial Estate, Unit 19wind turbinewind turbine—application submitted may be out of dateupdated Jan 2021Dec 2020—Jan 2021Blaenau Gwent8.5
Rassau Industrial Estate, Rassaurooftop solarrooftop solar—approved, not built may be out of dateupdated Sep 2023Mar 2023granted Jul 2023Sep 2023Blaenau Gwent8.7

Distance from the average position of the NP8 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.

By type

TypeAllPendingApprovedOperationalRefusedMW in pipeline
Rooftop solar101000
Wind farm100000
Wind turbine211001.5
Battery storage2020014

MW in pipeline: pending, approved and under-construction capacity.

How Powys decides solar, wind and battery applications

ApplicationsPowysUK
Decided applications (solar, wind, battery)4210,236
Refused15 (36%)19%
Solar refused2 of 1512%
Onshore wind refused12 of 2445%
Battery storage refused1 of 316%
Median time from submission to decision78.6 weeks17.0 weeks
Appeals lodged / allowed5 / 3—

UK: all UK planning authorities. Counted under these REPD planning authority names: DECC (S36), Powys.

All projects in Powys

Is the status up to date?

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near NP8, 4 projects have a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.