Adj To The A614 Solar (40 MW)
Adj To The A614 Solar is a 40 MW solar farm project in Bassetlaw, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 10 April 2024, no decision recorded; the record was last updated on 18 April 2024. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.
The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.
Planning timeline
| Date | Stage |
|---|---|
| 10 April 2024 | Application submitted |
Project details
- Technology
- solar farm
- Capacity
- 40 MW
- Status (REPD)
- application submitted
- Record last updated
- 18 April 2024
- Operator or applicant
- One Planet Developments Limited
- Planning authority
- Bassetlaw
- Planning application reference
- 24/00384/FUL
- Site area
- 88.3 ha
- Address (REPD)
- Normanton Larches, Blyth Road, Worksop, Nottinghamshire
- Council area (by location)
- Bassetlaw
- Name in REPD
- Adj To The A614 - Solar
- REPD reference
- 8115
The scheme also includes battery storage, recorded separately in REPD (approved, not built).
Who decides
| Applications | Bassetlaw | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 40 | 10,236 |
| Refused | 5 (12%) | 19% |
| Solar refused | 0 of 25 | 12% |
| Onshore wind refused | 5 of 7 | 45% |
| Battery storage refused | 0 of 8 | 16% |
| Median time from submission to decision | 13.9 weeks | 17.0 weeks |
| Appeals lodged / allowed | 2 / 0 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Elkesley Southbound, Elkesley | battery storage | 480 | application submitted | 2.4 |
| Little Morton Solar Farm | solar farm | 14.3 | operational | 4.2 |
| Walkers Wood Solar Park | solar farm | 27 | operational | 5.0 |
| Manton Wood | battery storage | 10 | permission expired | 5.8 |
| Netherfield Lane | solar farm | 19.7 | operational | 6.4 |
| Welbeck Solar / Hazel Gap | solar farm | 16 | operational | 6.7 |
| Rayton Farm Lane Solar Farm | solar farm | 34 | approved, not built | 6.8 |
| Westwood Farm Solar Park | solar farm | 5.1 | operational | 8.0 |
| Welbeck Colliery | solar farm | 11.3 | operational | 9.4 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.269, -1.0187).