Avonmouth Wind Power (8.2 MW)

Avonmouth Wind Power is an 8.2 MW wind farm project in Bristol, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 6 February 2014; the record was last updated on 27 February 2014.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

8.2 MWwind farm
operationalstatus in REPD
27 February 2014record last updated
Bristolcouncil area

Planning timeline

DateStage
8 December 2008Application submitted
25 March 2009Planning permission granted
3 December 2012Construction started
6 February 2014Operational

Project details

Technology
wind farm
Capacity
8.2 MW
Status (REPD)
operational
Record last updated
27 February 2014
Operator or applicant
Wessex Water Engineering Services
Planning authority
Bristol, City of
Planning application reference
08/04925/F
Turbines
4
Address (REPD)
Bristol Sewage Treatment Work, Bristol, BS11 0YS
Council area (by location)
Bristol
Time to decision
15 weeks
REPD reference
3664

Who decides

ApplicationsBristolUK
Decided applications (solar, wind, battery)3210,236
Refused0 (0%)19%
Solar refused0 of 1812%
Onshore wind refused0 of 645%
Battery storage refused0 of 816%
Median time from submission to decision14.1 weeks17.0 weeks
Appeals lodged / allowed0 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Kings Weston Lanebattery storage20approved, not built0.4
Severn Roadbattery storage32operational1.2
Avonmouth Port - extensionwind farm9operational2.0
Severn Road, Hallenbattery storage70approved, not built2.1
Avonmouth Portwind farm6operational2.2
Unnamed battery storage (REPD 6907)battery storage20abandoned2.4
Avonmouth Port IIwind farm5operational3.0
Etex Building Performance, Redland Avenuerooftop solar6.2approved, not built3.5
Etex Building Performance, Redland Avenuerooftop solar5.9approved, not built3.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.5115, -2.6735).