Bradley Road Solar Farm (43.7 MW)
Bradley Road Solar Farm is a 43.7 MW solar farm project in North East Lincolnshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 26 April 2024, not yet built; the record was last updated on 3 May 2024.
43.7 MWsolar farm
approved, not builtstatus in REPD
3 May 2024record last updated
North East Lincolnshirecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 28 November 2023 | Application submitted |
| 26 April 2024 | Planning permission granted |
| 26 April 2027 | Permission due to expire (unless work starts) |
Project details
- Technology
- solar farm
- Capacity
- 43.7 MW
- Status (REPD)
- approved, not built
- Record last updated
- 3 May 2024
- Operator or applicant
- Renewable Connections Developments Limited
- Planning authority
- North East Lincolnshire
- Planning application reference
- DM/1156/23/FUL
- Site area
- 81.7 ha
- Address (REPD)
- W/O Bradley Road, Grimsby
- Council area (by location)
- North East Lincolnshire
- Time to decision
- 21 weeks
- Name in REPD
- Bradley Road - Solar Farm
- REPD reference
- 13862
Recorded together with Bradley Road (10 MW battery storage, approved, not built).
Who decides
| Applications | North East Lincolnshire | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 41 | 10,236 |
| Refused | 2 (5%) | 19% |
| Solar refused | 1 of 30 | 12% |
| Onshore wind refused | 0 of 2 | 45% |
| Battery storage refused | 1 of 9 | 16% |
| Median time from submission to decision | 17.6 weeks | 17.0 weeks |
| Appeals lodged / allowed | 0 / 0 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Low Farm Solar Array | solar farm | 20 | operational | 1.6 |
| Magnolia Street | battery storage | 20 | abandoned | 2.3 |
| Laceby Solar Farm | solar farm | 27.1 | operational | 2.8 |
| West Marsh (Phase 2) | solar farm | 5 | abandoned | 3.0 |
| Macaulay Lane Solar Farm | solar farm | 8 | application withdrawn | 3.0 |
| Grimsby Solar Farm | solar farm | 49.9 | under construction | 3.7 |
| Hewitts Avenue, New Waltham | battery storage | 49.9 | approved, not built | 5.0 |
| Stallingborough Road | solar farm | 12.4 | application submitted | 6.5 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.5465, -0.1228).