Macaulay Lane Solar Farm (8 MW)

Macaulay Lane Solar Farm is an 8 MW solar farm project in North East Lincolnshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 9 September 2022; the record was last updated on 23 September 2022.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

8 MWsolar farm
application withdrawnstatus in REPD
23 September 2022record last updated
North East Lincolnshirecouncil area

Planning timeline

DateStage
4 May 2021Application submitted
9 September 2022Application withdrawn

Project details

Technology
solar farm
Capacity
8 MW
Status (REPD)
application withdrawn
Record last updated
23 September 2022
Operator or applicant
SEC Power 3 Limited
Planning authority
North East Lincolnshire
Planning application reference
DM/0331/21/FUL
Site area
14.9 ha
Address (REPD)
Macaulay Lane Former Refuse Disposal Site Macaulay Street Grimsby
Council area (by location)
North East Lincolnshire
REPD reference
9029

Who decides

ApplicationsNorth East LincolnshireUK
Decided applications (solar, wind, battery)4110,236
Refused2 (5%)19%
Solar refused1 of 3012%
Onshore wind refused0 of 245%
Battery storage refused1 of 916%
Median time from submission to decision17.6 weeks17.0 weeks
Appeals lodged / allowed0 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
West Marsh (Phase 2)solar farm5abandoned<0.1
Magnolia Streetbattery storage20abandoned0.8
Bradley Roadbattery storage10approved, not built3.0
Bradley Road Solar Farmsolar farm43.7approved, not built3.0
Grimsby Solar Farmsolar farm49.9under construction4.6
Low Farm Solar Arraysolar farm20operational4.7
Stallingborough Wind farmwind farm6application withdrawn5.2
Hewitts Avenue, New Walthambattery storage49.9approved, not built5.4
Laceby Solar Farmsolar farm27.1operational5.8

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.5722, -0.1072).