Stallingborough Wind farm (6 MW)

Stallingborough Wind farm is a 6 MW wind farm project in North East Lincolnshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 13 August 2012; the record was last updated on 31 August 2012.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

6 MWwind farm
application withdrawnstatus in REPD
31 August 2012record last updated
North East Lincolnshirecouncil area

Planning timeline

DateStage
23 July 2008Application submitted
13 August 2012Application withdrawn

Project details

Technology
wind farm
Capacity
6 MW
Status (REPD)
application withdrawn
Record last updated
31 August 2012
Operator or applicant
Aeolian Stallingborough Ltd
Planning authority
North East Lincolnshire
Planning application reference
DC/827/08/IMM
Turbines
2
Address (REPD)
land off North Moss Lane, Stallingborough, North East Lincolnshire.
Council area (by location)
North East Lincolnshire
REPD reference
3815

Who decides

ApplicationsNorth East LincolnshireUK
Decided applications (solar, wind, battery)4110,236
Refused2 (5%)19%
Solar refused1 of 3012%
Onshore wind refused0 of 245%
Battery storage refused1 of 916%
Median time from submission to decision17.6 weeks17.0 weeks
Appeals lodged / allowed0 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Europa Waybattery storage80approved, not built0.9
Trondheim Waybattery storage5approved, not built1.0
Trondheim Way Battery energy storagebattery storage80under construction1.0
Netherlands Way Battery Energy Facilitybattery storage80approved, not built1.1
Mauxhall Farmsolar farm18permission expired2.2
Mauxhall Farmbattery storage24permission expired2.2
Solar Farm at Adj To A180solar farm49.9approved, not built2.6
Immingham Solar Farmbattery storage30approved, not built2.6
Stallingborough Roadsolar farm12.4application submitted3.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.6028, -0.1664).