Trondheim Way (5 MW battery storage)
Trondheim Way is a 5 MW battery storage project in North East Lincolnshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 5 April 2022, not yet built; the record was last updated on 25 March 2022. REPD also records that the planning permission expired on 5 April 2025, so the project may not go ahead in this form. Check the planning authority's register for the latest position.
REPD also records that the planning permission expired on 5 April 2025, so the project may not go ahead in this form.
Planning timeline
| Date | Stage |
|---|---|
| 7 March 2022 | Application submitted |
| 5 April 2022 | Planning permission granted |
| 5 April 2025 | Permission expired |
Project details
- Technology
- battery storage (stand-alone storage)
- Capacity
- 5 MW
- Status (REPD)
- approved, not built
- Record last updated
- 25 March 2022
- Operator or applicant
- Vox Energy Limited
- Planning authority
- North East Lincolnshire
- Planning application reference
- DM/1158/21/FUL
- Address (REPD)
- Trondheim Way, Stallingborough, Grimsby
- Council area (by location)
- North East Lincolnshire
- Time to decision
- 4 weeks
- Name in REPD
- Trondheim Way - Battery Storage Facility
- REPD reference
- 10872
Who decides
| Applications | North East Lincolnshire | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 41 | 10,236 |
| Refused | 2 (5%) | 19% |
| Solar refused | 1 of 30 | 12% |
| Onshore wind refused | 0 of 2 | 45% |
| Battery storage refused | 1 of 9 | 16% |
| Median time from submission to decision | 17.6 weeks | 17.0 weeks |
| Appeals lodged / allowed | 0 / 0 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Trondheim Way Battery energy storage | battery storage | 80 | under construction | <0.1 |
| Netherlands Way Battery Energy Facility | battery storage | 80 | approved, not built | 0.4 |
| Europa Way | battery storage | 80 | approved, not built | 0.7 |
| Stallingborough Wind farm | wind farm | 6 | application withdrawn | 1.0 |
| Mauxhall Farm | solar farm | 18 | permission expired | 1.4 |
| Mauxhall Farm | battery storage | 24 | permission expired | 1.4 |
| Solar Farm at Adj To A180 | solar farm | 49.9 | approved, not built | 1.6 |
| Immingham Solar Farm | battery storage | 30 | approved, not built | 1.6 |
| Stallingboroughe, Stallingborough Road Solar PV Energy | solar farm | 37.4 | approved, not built | 2.7 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.6065, -0.1802).