Immingham Solar Farm (30 MW)
Immingham Solar Farm is a 30 MW battery storage project in North East Lincolnshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 6 May 2025, not yet built; the record was last updated on 12 May 2025.
30 MWbattery storage
approved, not builtstatus in REPD
12 May 2025record last updated
North East Lincolnshirecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 22 February 2024 | Application submitted |
| 6 May 2025 | Planning permission granted |
Project details
- Technology
- battery storage (stand-alone storage)
- Capacity
- 30 MW
- Status (REPD)
- approved, not built
- Record last updated
- 12 May 2025
- Operator or applicant
- One Planet Developments Limited
- Planning authority
- North East Lincolnshire
- Planning application reference
- DM/0108/24/FUL
- Address (REPD)
- Adj To A180, To S/O Immingham, Immingham
- Council area (by location)
- North East Lincolnshire
- Time to decision
- 63 weeks
- Name in REPD
- Immingham Solar Farm - Battery Storage Facility
- REPD reference
- 16092
Who decides
| Applications | North East Lincolnshire | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 41 | 10,236 |
| Refused | 2 (5%) | 19% |
| Solar refused | 1 of 30 | 12% |
| Onshore wind refused | 0 of 2 | 45% |
| Battery storage refused | 1 of 9 | 16% |
| Median time from submission to decision | 17.6 weeks | 17.0 weeks |
| Appeals lodged / allowed | 0 / 0 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Solar Farm at Adj To A180 | solar farm | 49.9 | approved, not built | <0.1 |
| Mauxhall Farm | solar farm | 18 | permission expired | 0.6 |
| Mauxhall Farm | battery storage | 24 | permission expired | 0.6 |
| Stallingboroughe, Stallingborough Road Solar PV Energy | solar farm | 37.4 | approved, not built | 1.1 |
| Stallingboroughe, Stallingborough Road | battery storage | 375 | approved, not built | 1.1 |
| Trondheim Way Battery energy storage | battery storage | 80 | under construction | 1.6 |
| Trondheim Way | battery storage | 5 | approved, not built | 1.6 |
| Netherlands Way Battery Energy Facility | battery storage | 80 | approved, not built | 1.8 |
| Europa Way | battery storage | 80 | approved, not built | 2.2 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.6067, -0.2049).