Trondheim Way Battery energy storage (80 MW)
Trondheim Way Battery energy storage is an 80 MW battery storage project in North East Lincolnshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: under construction; the record was last updated on 13 May 2021.
80 MWbattery storage
under constructionstatus in REPD
13 May 2021record last updated
North East Lincolnshirecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 17 February 2021 | Application submitted |
| 23 January 2023 | Planning permission granted |
Project details
- Technology
- battery storage (stand-alone storage)
- Capacity
- 80 MW
- Status (REPD)
- under construction
- Record last updated
- 13 May 2021
- Operator or applicant
- Vox Burns Limited
- Planning authority
- North East Lincolnshire
- Planning application reference
- DM/0120/21/FUL
- Address (REPD)
- Land At Trondheim Way Stallingborough
- Council area (by location)
- North East Lincolnshire
- Time to decision
- 101 weeks
- REPD reference
- 8455
Who decides
| Applications | North East Lincolnshire | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 41 | 10,236 |
| Refused | 2 (5%) | 19% |
| Solar refused | 1 of 30 | 12% |
| Onshore wind refused | 0 of 2 | 45% |
| Battery storage refused | 1 of 9 | 16% |
| Median time from submission to decision | 17.6 weeks | 17.0 weeks |
| Appeals lodged / allowed | 0 / 0 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Trondheim Way | battery storage | 5 | approved, not built | <0.1 |
| Netherlands Way Battery Energy Facility | battery storage | 80 | approved, not built | 0.4 |
| Europa Way | battery storage | 80 | approved, not built | 0.7 |
| Stallingborough Wind farm | wind farm | 6 | application withdrawn | 1.0 |
| Mauxhall Farm | solar farm | 18 | permission expired | 1.4 |
| Mauxhall Farm | battery storage | 24 | permission expired | 1.4 |
| Solar Farm at Adj To A180 | solar farm | 49.9 | approved, not built | 1.6 |
| Immingham Solar Farm | battery storage | 30 | approved, not built | 1.6 |
| Stallingboroughe, Stallingborough Road Solar PV Energy | solar farm | 37.4 | approved, not built | 2.7 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.6065, -0.1802).