Cavendish Dock Road (40 MW floating solar)

Cavendish Dock Road is a 40 MW floating solar project in Westmorland and Furness, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 5 March 2025, no decision recorded; the record was last updated on 2 March 2026.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

40 MWfloating solar
application submittedstatus in REPD
2 March 2026record last updated
Westmorland and Furnesscouncil area

Planning timeline

DateStage
5 March 2025Application submitted

Project details

Technology
floating solar
Capacity
40 MW
Status (REPD)
application submitted
Record last updated
2 March 2026
Operator or applicant
Associated British Ports
Planning authority
Westmorland and Furness
Planning application reference
B03/2025/0085
Site area
21.1 ha
Address (REPD)
Cavendish Dock & Adj To The Port Of Barrow, Cavendish Dock Road, Barrow in Furness
Council area (by location)
Westmorland and Furness
Name in REPD
Cavendish Dock Road - Solar Array
REPD reference
17087

Who decides

ApplicationsWestmorland and FurnessUK
Decided applications (solar, wind, battery)6810,236
Refused30 (44%)19%
Solar refused14 of 4212%
Onshore wind refused14 of 1945%
Battery storage refused2 of 716%
Median time from submission to decision34.6 weeks17.0 weeks
Appeals lodged / allowed9 / 9—

Other large projects within 10 km

ProjectTypeMWStatuskm
Roosecotebattery storage49operational2.6
Roosecote Power Station, Rampside Roadbattery storage50application submitted2.6
Sowerby Lodge Farmsolar farm5operational4.3
Bleabeck Solar Farmsolar farm10application submitted7.8
Roanhead Farmsolar farm6.5operational8.3
Solar Farm at Bleabeck Solar Farmsolar farm10application submitted8.5
Hill Solar Farmsolar farm5application withdrawn9.2

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.1008, -3.23).