Bleabeck Solar Farm (10 MW)

Bleabeck Solar Farm is a 10 MW solar farm project in Westmorland and Furness, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 20 February 2025, no decision recorded; the record was last updated on 21 March 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

10 MWsolar farm
application submittedstatus in REPD
21 March 2025record last updated
Westmorland and Furnesscouncil area

Planning timeline

DateStage
20 February 2025Application submitted

Project details

Technology
solar farm
Capacity
10 MW
Status (REPD)
application submitted
Record last updated
21 March 2025
Operator or applicant
Noventum Power Limited
Planning authority
Westmorland and Furness
Planning application reference
B03/2024/0551
Site area
19.3 ha
Address (REPD)
Roanhead Farm, Hawthwaite Lane, Barrow in Furness
Council area (by location)
Westmorland and Furness
Name in REPD
Bleabeck - Solar Farm
REPD reference
14271

Who decides

ApplicationsWestmorland and FurnessUK
Decided applications (solar, wind, battery)6810,236
Refused30 (44%)19%
Solar refused14 of 4212%
Onshore wind refused14 of 1945%
Battery storage refused2 of 716%
Median time from submission to decision34.6 weeks17.0 weeks
Appeals lodged / allowed9 / 9—

Other large projects within 10 km

ProjectTypeMWStatuskm
Roanhead Farmsolar farm6.5operational0.6
Solar Farm at Bleabeck Solar Farmsolar farm10application submitted1.3
Hill Solar Farmsolar farm5application withdrawn2.6
Sowerby Lodge Farmsolar farm5operational3.8
Furness Wind Farm/High Winds (Harlock Repowering)wind farm11.5operational6.2
Langthwaite Farmwind farm12application submitted6.8
Haverigg Prisonwind farm9abandoned7.4
Roosecote Power Station, Rampside Roadbattery storage50application submitted7.5
Roosecotebattery storage49operational7.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.1706, -3.2171).