Langthwaite Farm (12 MW wind farm)

Langthwaite Farm is a 12 MW wind farm project in Cumberland, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 30 March 2012, no decision recorded; the record was last updated on 26 June 2019. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

12 MWwind farm
application submittedmay be out of datestatus in REPD
26 June 2019record last updated
Cumberlandcouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
30 March 2012Application submitted

Project details

Technology
wind farm
Capacity
12 MW
Status (REPD)
application submitted
Record last updated
26 June 2019
Operator or applicant
REG Windpower (previously Cornwall Light and Power)
Planning authority
Cumberland
Planning application reference
4/12/2182/0F1
Turbines
6
Address (REPD)
Millom
Council area (by location)
Cumberland
REPD reference
4158

Who decides

ApplicationsCumberlandUK
Decided applications (solar, wind, battery)9110,236
Refused30 (33%)19%
Solar refused4 of 3212%
Onshore wind refused25 of 4545%
Battery storage refused1 of 1416%
Median time from submission to decision22.4 weeks17.0 weeks
Appeals lodged / allowed7 / 9—

Other large projects within 10 km

ProjectTypeMWStatuskm
Haverigg Prisonwind farm9abandoned2.1
Bleabeck Solar Farmsolar farm10application submitted6.8
Roanhead Farmsolar farm6.5operational6.9
Solar Farm at Bleabeck Solar Farmsolar farm10application submitted7.5
Hill Solar Farmsolar farm5application withdrawn8.5
Sowerby Lodge Farmsolar farm5operational8.7
Furness Wind Farm/High Winds (Harlock Repowering)wind farm11.5operational9.7
Kirkby Moor Repoweringwind farm18refused10.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.2094, -3.2974).