Roosecote Power Station, Rampside Road (50 MW battery storage)
Roosecote Power Station, Rampside Road is a 50 MW battery storage project in Westmorland and Furness, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 27 August 2025, no decision recorded; the record was last updated on 6 October 2025.
50 MWbattery storage
application submittedstatus in REPD
6 October 2025record last updated
Westmorland and Furnesscouncil area
Planning timeline
| Date | Stage |
|---|---|
| 27 August 2025 | Application submitted |
Project details
- Technology
- battery storage (stand-alone storage)
- Capacity
- 50 MW
- Status (REPD)
- application submitted
- Record last updated
- 6 October 2025
- Operator or applicant
- Centrica Plc
- Planning authority
- Westmorland and Furness
- Planning application reference
- B03/2025/0281
- Address (REPD)
- Former Roosecote Power Station, Rampside Road, Barrow in Furness
- Council area (by location)
- Westmorland and Furness
- Name in REPD
- Roosecote Power Station, Rampside Road - Battery Energy Storage System
- REPD reference
- 19570
Who decides
| Applications | Westmorland and Furness | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 68 | 10,236 |
| Refused | 30 (44%) | 19% |
| Solar refused | 14 of 42 | 12% |
| Onshore wind refused | 14 of 19 | 45% |
| Battery storage refused | 2 of 7 | 16% |
| Median time from submission to decision | 34.6 weeks | 17.0 weeks |
| Appeals lodged / allowed | 9 / 9 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Roosecote | battery storage | 49 | operational | <0.1 |
| Cavendish Dock Road | floating solar | 40 | application submitted | 2.6 |
| Sowerby Lodge Farm | solar farm | 5 | operational | 5.0 |
| Bleabeck Solar Farm | solar farm | 10 | application submitted | 7.5 |
| Solar Farm at Bleabeck Solar Farm | solar farm | 10 | application submitted | 7.8 |
| Roanhead Farm | solar farm | 6.5 | operational | 7.8 |
| Hill Solar Farm | solar farm | 5 | application withdrawn | 8.1 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.1052, -3.19).