Energy Projects Near You

Foxholes Farm, Roman Road (49.9 MW solar farm)

Foxholes Farm, Roman Road is a 49.9 MW solar farm project in North Northamptonshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 19 December 2022, no decision recorded; the record was last updated on 23 December 2022. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

49.9 MWsolar farm
application submittedmay be out of datestatus in REPD
23 December 2022record last updated
North Northamptonshirecouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
19 December 2022Application submitted

Project details

Technology
solar farm
Capacity
49.9 MW
Status (REPD)
application submitted
Record last updated
23 December 2022
Operator or applicant
Elgin Energy Esco Limited
Planning authority
North Northamptonshire
Planning application reference
NE/22/01411/FUL
Site area
68.3 ha
Address (REPD)
Adjacent To Foxholes Farm Roman Road Titchmarsh
Council area (by location)
North Northamptonshire
Name in REPD
Foxholes Farm, Roman Road - Solar Panels
REPD reference
12754

Who decides

ApplicationsNorth NorthamptonshireUK
Decided applications (solar, wind, battery)6810,236
Refused11 (16%)19%
Solar refused2 of 4412%
Onshore wind refused5 of 1145%
Battery storage refused4 of 1316%
Median time from submission to decision11.4 weeks17.0 weeks
Appeals lodged / allowed1 / 3—

Other large projects within 10 km

ProjectTypeMWStatuskm
Wood Lodge Farm, Huntingdon Road Solar Farmsolar farm50application submitted1.7
RAF Molesworth Wind Farmwind farm15refused2.6
Colpmans Farmsolar farm5operational6.3
Ellands Farmwind farm18refused6.6
Barnwell Manor Wind Farmwind farm10refused on appeal8.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.3997, -0.4692).