Glenmuckloch Wind Farm (33.6 MW)

Glenmuckloch Wind Farm is a 33.6 MW wind farm project in Dumfries and Galloway, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 16 May 2017, not yet built; the record was last updated on 14 June 2022. REPD also records that the planning permission expired on 16 May 2020, so the project may not go ahead in this form. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

33.6 MWwind farm
approved, not builtmay be out of datestatus in REPD
14 June 2022record last updated
Dumfries and Gallowaycouncil area

REPD also records that the planning permission expired on 16 May 2020, so the project may not go ahead in this form.

Planning timeline

DateStage
15 June 2015Application submitted
16 May 2017Planning permission granted
16 May 2020Permission expired

Project details

Technology
wind farm
Capacity
33.6 MW
Status (REPD)
approved, not built
Record last updated
14 June 2022
Operator or applicant
Forsa (formerly Buccleuch/2020)
Planning authority
Dumfries and Galloway
Planning application reference
15/P/3/0236
Turbines
8
Turbine height
150 m
Address (REPD)
Glenmuckloch Surface Coal Mine
Council area (by location)
Dumfries and Galloway
Time to decision
100 weeks
REPD reference
4492

Who decides

ApplicationsDumfries and GallowayUK
Decided applications (solar, wind, battery)10610,236
Refused40 (38%)19%
Solar refused1 of 1812%
Onshore wind refused33 of 7245%
Battery storage refused6 of 1616%
Median time from submission to decision60.9 weeks17.0 weeks
Appeals lodged / allowed19 / 17—

Other large projects within 10 km

ProjectTypeMWStatuskm
Lagrae Battery Energy Storage Systembattery storage400application submitted1.7
Lethans Wind Farmwind farm106approved, not built2.0
Wind Turbines at Former Glenmuckloch Surface Coal Mine North Of Kirkconnelwind farm33.6application submitted2.4
Lethans Wind Farm Extensionwind farm66approved, not built4.6
Sandy Knowe Wind Farmwind farm81.6operational5.1
Spango Community Wind Farmwind farm49refused5.8
Spango Community Wind Farmwind farm49application withdrawn6.8
Whiteside Hillwind farm25.3operational6.9
Kennoxhead Wind Farm Extension II (Penbreck) (Phase 2)wind farm45.6approved, not built7.3

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.4179, -4.051).