Wind Turbines at Former Glenmuckloch Surface Coal Mine North Of Kirkconnel (33.6 MW)

Wind Turbines at Former Glenmuckloch Surface Coal Mine North Of Kirkconnel is a 33.6 MW wind farm project in Dumfries and Galloway, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 21 November 2025, no decision recorded; the record was last updated on 17 December 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

33.6 MWwind farm
application submittedstatus in REPD
17 December 2025record last updated
Dumfries and Gallowaycouncil area

Planning timeline

DateStage
21 November 2025Application submitted

Project details

Technology
wind farm
Capacity
33.6 MW
Status (REPD)
application submitted
Record last updated
17 December 2025
Operator or applicant
Glenmuckloch Renewable Energy Limited
Planning authority
Dumfries and Galloway
Planning application reference
25/2122/FUL
Turbines
6
Turbine height
250 m
Address (REPD)
Former Glenmuckloch Surface Coal Mine North Of Kirkconnel
Council area (by location)
Dumfries and Galloway
Name in REPD
Glenmuckloch Hill Wind Farm, Kirkconnel - Wind Turbines
REPD reference
16862

Who decides

ApplicationsDumfries and GallowayUK
Decided applications (solar, wind, battery)10610,236
Refused40 (38%)19%
Solar refused1 of 1812%
Onshore wind refused33 of 7245%
Battery storage refused6 of 1616%
Median time from submission to decision60.9 weeks17.0 weeks
Appeals lodged / allowed19 / 17—

Other large projects within 10 km

ProjectTypeMWStatuskm
Lagrae Battery Energy Storage Systembattery storage400application submitted1.1
Glenmuckloch Wind Farmwind farm33.6approved, not built2.4
Sandy Knowe Wind Farmwind farm81.6operational2.6
Lethans Wind Farmwind farm106approved, not built3.4
Whiteside Hillwind farm25.3operational4.5
Lethans Wind Farm Extensionwind farm66approved, not built4.5
Spango Community Wind Farmwind farm49refused5.7
Sanquhar Community Windfarmwind farm32.4operational5.8
Hare Hill Extensionwind farm29.8operational6.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.3959, -4.0488).