Godsfield Solar Farm (11.8 MW)

Godsfield Solar Farm is an 11.8 MW solar farm project in Winchester, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 26 April 2022; the record was last updated on 17 May 2022.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

11.8 MWsolar farm
application withdrawnstatus in REPD
17 May 2022record last updated
Winchestercouncil area

Planning timeline

DateStage
5 January 2021Application submitted
26 April 2022Application withdrawn

Project details

Technology
solar farm
Capacity
11.8 MW
Status (REPD)
application withdrawn
Record last updated
17 May 2022
Operator or applicant
Anesco Limited
Planning authority
Winchester
Planning application reference
20/02832/FUL
Site area
21.7 ha
Address (REPD)
Land Adjacent Godsfield Copse Godsfield Lane Old Alresford
Council area (by location)
Winchester
REPD reference
6213

Who decides

ApplicationsWinchesterUK
Decided applications (solar, wind, battery)3710,236
Refused4 (11%)19%
Solar refused0 of 2412%
Onshore wind refused3 of 345%
Battery storage refused1 of 1016%
Median time from submission to decision14.7 weeks17.0 weeks
Appeals lodged / allowed3 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Upper Farm solar parksolar farm12operational4.9
Preston Farm, Preston Candoversolar farm28approved, not built5.2
Western Court, Bishops Sutton Road Solar Farmsolar farm5.4application submitted5.6
Bishops Suttonsolar farm12operational5.9
Woodmancott Downwind farm18refused6.4
Frying Down Copse Solar Farmsolar farm5operational10.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.1349, -1.1363).