Green Burn Wind Farm (33 MW)

Green Burn Wind Farm is a 33 MW wind farm project in Perth and Kinross, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: abandoned; the record was last updated on 7 December 2021.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

33 MWwind farm
abandonedstatus in REPD
7 December 2021record last updated
Perth and Kinrosscouncil area

Planning timeline

DateStage
7 October 2015Application submitted
15 March 2017Refused by the planning authority
13 June 2017Appeal lodged
20 February 2018Planning permission granted
20 February 2018Appeal allowed
20 February 2023Permission expired

Project details

Technology
wind farm
Capacity
33 MW
Status (REPD)
abandoned
Record last updated
7 December 2021
Operator or applicant
ABO Wind
Planning authority
Perth and Kinross
Planning application reference
15/01691/FLM
Appeal reference
PPA-340-2109
Turbines
11
Turbine height
115 m
Address (REPD)
land at Blackhall Farm and Shieldrum Farm, approximately 11km north-west of Alyth and 5km north-east of Bridge of Cally in Perth and Kinross
Council area (by location)
Perth and Kinross
Time to decision
124 weeks
REPD reference
3629

Who decides

ApplicationsPerth and KinrossUK
Decided applications (solar, wind, battery)7310,236
Refused32 (44%)19%
Solar refused6 of 2412%
Onshore wind refused23 of 3145%
Battery storage refused3 of 1816%
Median time from submission to decision28.3 weeks17.0 weeks
Appeals lodged / allowed7 / 8—

Other large projects within 10 km

ProjectTypeMWStatuskm
Saddle Hill Wind Farmwind farm35refused4.5
Tullymurdoch Wind Farmwind farm14.4operational5.0
Welton Of Creuchieswind farm9.2operational7.9
Welton of Creuchieswind farm9.2application withdrawn8.1
Bamff Wind Farmwind farm14refused on appeal8.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (56.6849, -3.3749).