Kincraig Solar Farm and battery storage system (21 MW)

Kincraig Solar Farm and battery storage system is a 21 MW solar farm project in Aberdeenshire, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: under construction since 1 October 2024; the record was last updated on 17 June 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

21 MWsolar farm
under constructionstatus in REPD
17 June 2025record last updated
Aberdeenshirecouncil area

Planning timeline

DateStage
14 April 2022Application submitted
18 October 2022Planning permission granted
1 October 2024Construction started

Project details

Technology
solar farm
Capacity
21 MW
Status (REPD)
under construction
Record last updated
17 June 2025
Operator or applicant
Renewable Connections Developments Limited
Planning authority
Aberdeenshire
Planning application reference
APP/2022/0838
Site area
36.0 ha
Address (REPD)
Kincraig Ellon
Council area (by location)
Aberdeenshire
Time to decision
27 weeks
Name in REPD
Kincraig - Solar Farm and battery storage system
REPD reference
11177

The scheme also includes 21 MW of solar farm, recorded separately in REPD (under construction).

Who decides

ApplicationsAberdeenshireUK
Decided applications (solar, wind, battery)20010,236
Refused64 (32%)19%
Solar refused1 of 4012%
Onshore wind refused60 of 13245%
Battery storage refused3 of 2816%
Median time from submission to decision40.6 weeks17.0 weeks
Appeals lodged / allowed15 / 13—

Other large projects within 10 km

ProjectTypeMWStatuskm
Hill of Fiddeswind farm6.9operational2.8
Middleton Of Potterton Farmbattery storage49.9approved, not built9.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (57.3126, -2.0639).