Lisnamuck Wind Farm (6 MW)

Lisnamuck Wind Farm is a 6 MW wind farm project in Causeway Coast and Glens, Northern Ireland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 1 October 2010; the record was last updated on 4 April 2011.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

6 MWwind farm
application withdrawnstatus in REPD
4 April 2011record last updated
Causeway Coast and Glenscouncil area

Planning timeline

DateStage
21 February 2008Application submitted
1 October 2010Application withdrawn

Project details

Technology
wind farm
Capacity
6 MW
Status (REPD)
application withdrawn
Record last updated
4 April 2011
Operator or applicant
Lisnamuck Wind Farm Limited
Planning authority
Causeway Coast and Glens
Planning application reference
C/2008/0163/F
Turbines
3
Address (REPD)
Land approximately 750m south of 13B Lisnamuck Road, Blackhill, Coleraine
Council area (by location)
Causeway Coast and Glens
REPD reference
2718

Who decides

ApplicationsCauseway Coast and GlensUK
Decided applications (solar, wind, battery)4710,236
Refused6 (13%)19%
Solar refused0 of 412%
Onshore wind refused6 of 4145%
Battery storage refused0 of 216%
Median time from submission to decision103.0 weeks17.0 weeks
Appeals lodged / allowed5 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
Cam Burn Wind Farmwind farm13.8abandoned3.2
Garves Mountain Farmwind farm15operational7.3
Croaghanwind farm12.5application withdrawn8.0
Upper Ballyrogan Wind Farmwind farm11.5abandoned8.4
Brockaghboy Wind Farmwind farm37.5operational9.8

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.042, -6.655).