Little Flanchford Farm, Flanchford Road Solar Energy (20 MW)
Little Flanchford Farm, Flanchford Road Solar Energy is a 20 MW solar farm project in Mole Valley, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 28 November 2024, no decision recorded; the record was last updated on 3 January 2025.
20 MWsolar farm
application submittedstatus in REPD
3 January 2025record last updated
Mole Valleycouncil area
Planning timeline
| Date | Stage |
|---|---|
| 28 November 2024 | Application submitted |
Project details
- Technology
- solar farm
- Capacity
- 20 MW
- Status (REPD)
- application submitted
- Record last updated
- 3 January 2025
- Operator or applicant
- Ilos Little Flanchford Limited
- Planning authority
- Mole Valley
- Planning application reference
- MO/2024/1823
- Site area
- 27.3 ha
- Address (REPD)
- Little Flanchford Farm, Flanchford Road, Leigh, Reigate
- Council area (by location)
- Mole Valley
- Name in REPD
- Little Flanchford Farm, Flanchford Road - Solar Energy
- REPD reference
- 16004
Who decides
Mole Valley has 9 decided solar, wind or battery applications in REPD — too few for a refusal rate (we show one from 10 decisions). Across all UK planning authorities 19% of 10,236 decisions were refusals.
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Mynthurst Farm | solar farm | 13.4 | refused on appeal | 2.8 |
| Horsham Road | solar | 5 | refused on appeal | 7.7 |
| Dorking Battery Energy Storage System | battery storage | 6 | operational | 8.2 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.215, -0.2397).