Melvich Wind Energy Hub (57.6 MW)

Melvich Wind Energy Hub is a 57.6 MW wind farm project in Highland, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 29 March 2023, no decision recorded; the record was last updated on 15 July 2022. As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

57.6 MWwind farm
application submittedmay be out of datestatus in REPD
15 July 2022record last updated
Highlandcouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
29 March 2023Application submitted

Project details

Technology
wind farm
Capacity
57.6 MW
Status (REPD)
application submitted
Record last updated
15 July 2022
Operator or applicant
Belltown Power Limited
Planning authority
Scottish Government (S36)
Planning application reference
ECU00004515
Turbines
12
Turbine height
150 m
Address (REPD)
Melvich Bay, Melvich, Thurso
Council area (by location)
Highland
Name in REPD
Melvich Bay - Melvich Wind Energy Hub
REPD reference
11669

The scheme also includes 42 MW of battery storage, recorded separately in REPD (application submitted).

Who decides

As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. Scottish Government (S36) refused 18% of 334 decided solar, wind and battery applications in REPD (median 127 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Drum Hollistan Wind Farmwind farm35refused4.7
Loch Toftingall, Halsary Wind Farmbattery storage49.9approved, not built8.1
Limekiln, Borlum Housebattery storage70application submitted8.7
Armadale Wind Farmwind farm43.2application withdrawn9.4
Strathy Northwind farm67.7operational9.7
Dounreay, Thursobattery storage34under construction9.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (58.5541, -3.9193).