Renewable energy projects in Highland
290 solar, wind or battery projects of 150 kW or more are located in Highland (REPD, July 2026 extract): 66 pending, 70 approved but not running, 66 operational and 56 refused. The council refused 68 of 160 decided applications (42%; UK 19%), with a median 52 weeks from submission to decision.
290projects in the council area
66awaiting a decision
70approved, not running
42%of decisions refused
How Highland decides
| Applications | Highland | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 160 | 10,236 |
| Refused | 68 (42%) | 19% |
| Solar refused | 0 of 15 | 12% |
| Onshore wind refused | 61 of 114 | 45% |
| Battery storage refused | 7 of 31 | 16% |
| Median time from submission to decision | 52.3 weeks | 17.0 weeks |
| Appeals lodged / allowed | 20 / 20 | — |
Projects in Highland
Projects of 1 MW and more (100)
| Project | Type | MW | Status (REPD) | Submitted | Decision | Record updated |
|---|---|---|---|---|---|---|
| Titan Battery Storagebattery storage | battery storage | 500 | application submittedupdated Jan 2026 | Sep 2025 | — | Jan 2026 |
| Glen Ullinish II Wind Farmwind farm | wind farm | 310 | application submitted may be out of dateupdated Apr 2022 | Jul 2023 | — | Apr 2022 |
| Philips Mains, Meybattery storage | battery storage | 300 | approved, not builtupdated Jun 2026 | Jun 2024 | granted Jan 2026 | Jun 2026 |
| Spittal Mains, Spittalbattery storage | battery storage | 300 | application submittedupdated Apr 2025 | Dec 2024 | — | Apr 2025 |
| Invershin Community Hall Wind Farm & Battery Storagewind farm | wind farm | 222 | approved, not builtupdated Apr 2025 | Apr 2021 | granted Feb 2025 | Apr 2025 |
| Corriemoillie Substation Garvebattery storage | battery storage | 200 | application submittedupdated Apr 2025 | Feb 2025 | — | Apr 2025 |
| Knocknagael, Essichbattery storage | battery storage | 200 | approved, not builtupdated Jun 2026 | Nov 2024 | granted Feb 2026 | Jun 2026 |
| Inveroykel Wind Farmwind farm | wind farm | 191 | application submittedupdated Apr 2026 | Feb 2026 | — | Apr 2026 |
| Wind Farm at 27km SE of Inverness 13km NW of Aviemorewind farm | wind farm | 187 | application submittedupdated May 2025 | Mar 2025 | — | May 2025 |
| Glenshero Wind Farmwind farm | wind farm | 168 | refusedupdated Mar 2022 | Sep 2018 | refused Mar 2022 | Mar 2022 |
| Achiesbattery storage | battery storage | 162 | application submittedupdated Oct 2025 | Jun 2025 | — | Oct 2025 |
| Ballach Wind Farmwind farm | wind farm | 144 | application submittedupdated Oct 2025 | Aug 2025 | — | Oct 2025 |
| Glenmorie Wind Farmwind farm | wind farm | 134 | refusedupdated Mar 2016 | Nov 2011 | refused Aug 2014 | Mar 2016 |
| Wind Farm at 4.2 km west of Aviemore and 25 km south west of Invernesswind farm | wind farm | 133 | application submittedupdated Apr 2025 | Jan 2025 | — | Apr 2025 |
| Cloiche Wind Farmwind farm | wind farm | 125 | approved, not builtupdated Aug 2025 | Apr 2020 | granted Nov 2023 | Aug 2025 |
| Scoolarywind farm | wind farm | 120 | application withdrawnupdated Apr 2008 | — | — | Apr 2008 |
| Glen Ullinish II Wind Farmbattery storage | battery storage | 120 | application submitted may be out of dateupdated Aug 2023 | Jul 2023 | — | Aug 2023 |
| Broubster Forestwind farm | wind farm | 116 | application withdrawnupdated May 2006 | — | — | May 2006 |
| Bhlaraidh (previously Balmacaan)wind farm | wind farm | 110 | operationalupdated Apr 2018 | Jun 2012 | granted Jan 2014 | Apr 2018 |
| Coille Linne Wind Farm- Wind Turbineswind farm | wind farm | 108 | application submittedupdated Jul 2025 | Jun 2025 | — | Jul 2025 |
| Shinness Wind Farmwind farm | wind farm | 106 | application submitted may be out of dateupdated Jun 2024 | Apr 2024 | — | Jun 2024 |
| Ourackwind farm | wind farm | 105 | approved, not builtupdated Apr 2025 | Oct 2022 | granted Mar 2025 | Apr 2025 |
| Shinness Wind Farmbattery storage | battery storage | 105 | application submitted may be out of dateupdated Jun 2024 | Apr 2024 | — | Jun 2024 |
| Lethen Wind Farm Wind Turbines and Energy Storagewind farm | wind farm | 102 | refusedupdated Apr 2024 | Jan 2022 | refused Feb 2024 | Apr 2024 |
| Lynemore Wind Farmwind farm | wind farm | 101 | application submittedupdated Jul 2025 | May 2025 | — | Jul 2025 |
| Clune Wind Farmbattery storage | battery storage | 100 | application submittedupdated May 2025 | Mar 2025 | — | May 2025 |
| Dunballoch Farm, Dunballochbattery storage | battery storage | 100 | application submittedupdated May 2025 | Dec 2024 | — | May 2025 |
| Dunmaglass Wind Farmwind farm | wind farm | 94 | operationalupdated Nov 2017 | Feb 2005 | granted Dec 2010 | Nov 2017 |
| Creag Riabhach Wind Farmwind farm | wind farm | 92.4 | operationalupdated Jan 2023 | Jan 2014 | granted Oct 2016 | Jan 2023 |
| Farr Wind Farmwind farm | wind farm | 92 | operationalupdated Sep 2020 | Sep 2002 | granted Oct 2004 | Sep 2020 |
| Beinneunwind farm | wind farm | 85 | operationalupdated Jul 2017 | Nov 2011 | granted Nov 2012 | Jul 2017 |
| Loch Liath Wind Farmwind farm | wind farm | 85 | application submitted may be out of dateupdated Sep 2022 | Apr 2023 | — | Sep 2022 |
| Carn Fearna Wind Farmwind farm | wind farm | 84.6 | application submittedupdated Jun 2025 | Apr 2025 | — | Jun 2025 |
| Bhlaraidh Wind Farm Extensionwind farm | wind farm | 84 | approved, not builtupdated Feb 2025 | Aug 2021 | granted Aug 2022 | Feb 2025 |
| Tomchrasky Estate Wind farmwind farm | wind farm | 84 | approved, not builtupdated Jul 2025 | Nov 2022 | granted May 2025 | Jul 2025 |
| Limekiln Wind Farmwind farm | wind farm | 79.8 | operationalupdated Apr 2025 | Jun 2016 | granted Jun 2019 | Apr 2025 |
| Acheilidh Wind Farm (Previously known as Lairg III)wind farm | wind farm | 79.2 | application submitted may be out of dateupdated Jun 2024 | May 2024 | — | Jun 2024 |
| Coille Beithwind farm | wind farm | 79.2 | application submittedupdated Oct 2025 | Jul 2025 | — | Oct 2025 |
| Wind Turbines at Kyllachy Wind Farmwind farm | wind farm | 78 | application submittedupdated Oct 2025 | Sep 2025 | — | Oct 2025 |
| Ceislein Wind Farmwind farm | wind farm | 77 | application submittedupdated Apr 2026 | Mar 2026 | — | Apr 2026 |
| Achany Extension Wind Farmwind farm | wind farm | 76 | approved, not builtupdated Feb 2026 | Jul 2021 | granted May 2023 | Feb 2026 |
| Laudale Wind Farmwind farm | wind farm | 75 | abandonedupdated Sep 2018 | — | — | Sep 2018 |
| Golticlay Wind Farmwind farm | wind farm | 72.6 | under constructionupdated Feb 2026 | Oct 2016 | granted Mar 2021 | Feb 2026 |
| Strath Oykel Wind Farmwind farm | wind farm | 72.6 | approved, not builtupdated Jan 2025 | May 2022 | granted Jan 2025 | Jan 2025 |
| Gordonbushwind farm | wind farm | 70 | operationalupdated Jul 2012 | Jun 2003 | granted Apr 2008 | Jul 2012 |
| Burnside Bhlaraidh - Chrathaich Wind Farmwind farm | wind farm | 70 | approved, not builtupdated Jan 2026 | Jul 2023 | granted May 2025 | Jan 2026 |
| Limekiln, Borlum Housebattery storage | battery storage | 70 | application submittedupdated Oct 2025 | Jul 2025 | — | Oct 2025 |
| Glen Calvie Wind Farm, Ardgaywind farm | wind farm | 69 | abandonedupdated Sep 2018 | — | — | Sep 2018 |
| Glencassley Wind Farmwind farm | wind farm | 69 | refusedupdated Dec 2015 | Jul 2012 | refused Nov 2015 | Dec 2015 |
| Caplich Wind Farmwind farm | wind farm | 68 | refused on appealupdated May 2018 | Jan 2015 | refused Apr 2018 | May 2018 |
| Cairn Duhie Wind Farmwind farm | wind farm | 67.2 | approved, not builtupdated Feb 2026 | Mar 2021 | granted Feb 2024 | Feb 2026 |
| Corriegarth 2wind farm | wind farm | 67.2 | approved, not builtupdated Jan 2024 | Jan 2021 | granted Dec 2023 | Jan 2024 |
| Moy Wind Farm (2nd Application)wind farm | wind farm | 66 | operationalupdated May 2016 | Apr 2013 | granted Jan 2014 | May 2016 |
| Dunbeathwind farm | wind farm | 66 | refusedupdated Jun 2013 | Aug 2005 | refused Jun 2013 | Jun 2013 |
| Paul's Hill and Extensionwind farm | wind farm | 65 | operationalupdated Oct 2017 | Sep 2001 | granted Mar 2003 | Oct 2017 |
| Ceislein Wind Farmbattery storage | battery storage | 65 | application submittedupdated Apr 2026 | Mar 2026 | — | Apr 2026 |
| Kintradwell Lodge Wind Farmwind farm | wind farm | 63 | refusedupdated Nov 2023 | Feb 2021 | refused Nov 2023 | Nov 2023 |
| Forse Wind Farmwind farm | wind farm | 60 | abandonedupdated Sep 2018 | — | — | Sep 2018 |
| Ben Aketil Wind Farm - Repowered & Extendedwind farm | wind farm | 59.4 | application submitted may be out of dateupdated Aug 2023 | Jun 2023 | — | Aug 2023 |
| Allt an Tuir Renewable Energy Parkwind farm | wind farm | 59.4 | application submittedupdated Apr 2025 | Feb 2025 | — | Apr 2025 |
| Abhainn Dubh Wind Farmwind farm | wind farm | 58.8 | application submitted may be out of dateupdated May 2022 | May 2023 | — | May 2022 |
| Culachy Wind Farmwind farm | wind farm | 57.6 | refusedupdated Jun 2026 | Nov 2023 | refused Mar 2026 | Jun 2026 |
| Melvich Wind Energy Hubwind farm | wind farm | 57.6 | application submitted may be out of dateupdated Jul 2022 | Mar 2023 | — | Jul 2022 |
| Invercassley Windfarmwind farm | wind farm | 55 | refused on appealupdated Jun 2010 | Oct 2005 | refused Dec 2006 | Jun 2010 |
| Corriemoilliewind farm | wind farm | 54.4 | operationalupdated Jan 2020 | Oct 2010 | granted Mar 2011 | Jan 2020 |
| West Garty Windfarmwind farm | wind farm | 54 | refused on appealupdated Nov 2018 | Dec 2014 | refused Oct 2018 | Nov 2018 |
| Braemorewind farm | wind farm | 54 | permission expiredupdated May 2020 | Dec 2010 | granted Oct 2017 | May 2020 |
| Kirkton Energy Farmwind farm | wind farm | 52.8 | refusedupdated May 2026 | Nov 2022 | refused Jan 2026 | May 2026 |
| Baillie Wind Farmwind farm | wind farm | 52.5 | operationalupdated May 2013 | Jul 2004 | granted Jan 2010 | May 2013 |
| Lochluichartwind farm | wind farm | 51 | operationalupdated Jan 2015 | Nov 2005 | granted Dec 2008 | Jan 2015 |
| Camsterwind farm | wind farm | 50 | operationalupdated Jul 2013 | Jan 2005 | granted Jan 2009 | Jul 2013 |
| Tormsdale -Wind Farmwind farm | wind farm | 50 | application submitted may be out of dateupdated Dec 2022 | Oct 2021 | — | Dec 2022 |
| Hollandmey Renewable Energy Developmentwind farm | wind farm | 50 | approved, not builtupdated Oct 2024 | Nov 2021 | granted Sep 2024 | Oct 2024 |
| Ourackbattery storage | battery storage | 50 | approved, not builtupdated Apr 2025 | Oct 2022 | granted Mar 2025 | Apr 2025 |
| Tomchrasky Estate Wind farmbattery storage | battery storage | 50 | approved, not builtupdated Jul 2025 | Nov 2022 | granted May 2025 | Jul 2025 |
| Fairways Business Parkbattery storage | battery storage | 50 | refusedupdated Apr 2024 | Feb 2023 | refused Apr 2024 | Apr 2024 |
| Lynemore Wind Farmbattery storage | battery storage | 50 | application submittedupdated Jul 2025 | May 2025 | — | Jul 2025 |
| Glen Ullinish Wind Farmwind farm | wind farm | 49.9 | approved, not builtupdated Feb 2026 | Oct 2014 | granted Mar 2015 | Feb 2026 |
| Torrdhuin, Auchteraw Battery Storage Facilitybattery storage | battery storage | 49.9 | operationalupdated Sep 2025 | Nov 2020 | granted Mar 2021 | Sep 2025 |
| Lairg 2 Wind Farmwind farm | wind farm | 49.9 | under constructionupdated Feb 2025 | Feb 2021 | granted Nov 2021 | Feb 2025 |
| Lochluichart Energy Storage Facilitybattery storage | battery storage | 49.9 | approved, not builtupdated Dec 2024 | Feb 2024 | granted Nov 2024 | Dec 2024 |
| Stainland Energy Storage Projectbattery storage | battery storage | 49.9 | approved, not builtupdated Jan 2025 | May 2022 | granted Nov 2022 | Jan 2025 |
| Boat of Gartenbattery storage | battery storage | 49.9 | application withdrawnupdated Mar 2022 | Feb 2022 | — | Mar 2022 |
| Househill House, Househillbattery storage | battery storage | 49.9 | approved, not built may be out of dateupdated Feb 2025 | Sep 2022 | granted Feb 2023 | Feb 2025 |
| Drumore Cottage, Swordalebattery storage | battery storage | 49.9 | approved, not builtupdated Jan 2025 | Jun 2023 | granted Dec 2024 | Jan 2025 |
| Loch Toftingall, Halsary Wind Farmbattery storage | battery storage | 49.9 | approved, not builtupdated Feb 2025 | Sep 2023 | granted Nov 2024 | Feb 2025 |
| Caulternich Croft Energy Storage Projectbattery storage | battery storage | 49.9 | refusedupdated Jul 2025 | Jun 2023 | refused Dec 2024 | Jul 2025 |
| Balblair Quarry, Balblair Battery Energy Storeage Systembattery storage | battery storage | 49.9 | approved, not builtupdated Jun 2025 | Apr 2024 | granted May 2025 | Jun 2025 |
| Slickly Wind Farmwind farm | wind farm | 49.9 | approved, not builtupdated Oct 2023 | Jan 2020 | granted Aug 2022 | Oct 2023 |
| Geiselittle Farmbattery storage | battery storage | 49.9 | approved, not builtupdated Nov 2025 | Aug 2024 | granted Aug 2025 | Nov 2025 |
| Spittal Mains Quarrybattery storage | battery storage | 49.9 | approved, not builtupdated May 2025 | Jul 2024 | granted Mar 2025 | May 2025 |
| Grigorhill Cottage, Grigorhillbattery storage | battery storage | 49.9 | approved, not builtupdated Mar 2026 | Feb 2025 | granted Jan 2026 | Mar 2026 |
| Buckies Farmbattery storage | battery storage | 49.9 | application submittedupdated Mar 2026 | Feb 2026 | — | Mar 2026 |
| Lythmore House, Technology Park Forssbattery storage | battery storage | 49.9 | approved, not builtupdated Sep 2025 | Nov 2024 | granted Aug 2025 | Sep 2025 |
| Cambusmorewind farm | wind farm | 49.5 | application withdrawnupdated Jun 2010 | — | — | Jun 2010 |
| Glen Kyllachy Wind Farmwind farm | wind farm | 48.5 | operationalupdated Aug 2022 | Jun 2013 | granted Apr 2015 | Aug 2022 |
| Causeymirewind farm | wind farm | 48.3 | operationalupdated May 2017 | Nov 2001 | granted Nov 2002 | May 2017 |
| Cairnview, Bettyhillwind farm | wind farm | 48 | approved, not builtupdated Mar 2024 | Jan 2023 | granted Feb 2024 | Mar 2024 |
| Watten Wind Farmwind farm | wind farm | 47.6 | application withdrawnupdated Jun 2026 | Aug 2023 | — | Jun 2026 |
| Kilbraur Windfarmwind farm | wind farm | 47.5 | operationalupdated Oct 2009 | Sep 2003 | granted Apr 2006 | Oct 2009 |
Smaller schemes under 1 MW, mostly rooftop solar (39)
| Project | Type | MW | Status (REPD) | Submitted | Decision | Record updated |
|---|---|---|---|---|---|---|
| Loch Calder Water Treatment Workrooftop solar | rooftop solar | 0.7 | approved, not builtupdated Oct 2025 | Aug 2025 | granted Sep 2025 | Oct 2025 |
| Quarry Braerooftop solar | rooftop solar | 0.7 | approved, not builtupdated Dec 2025 | Aug 2025 | granted Oct 2025 | Dec 2025 |
| Longman Pumping Station, Longman Drive - Photovoltaic Panelsrooftop solar | rooftop solar | 0.7 | approved, not builtupdated Jul 2024 | Apr 2024 | granted Jun 2024 | Jul 2024 |
| Swordale Wind turbinewind turbine | wind turbine | 0.6 | refusedupdated Oct 2021 | Mar 2021 | refused Sep 2021 | Oct 2021 |
| Alness Academysolar farm | solar farm | 0.5 | under constructionupdated Feb 2020 | Jan 2019 | granted Mar 2019 | Feb 2020 |
| Gorthleckwind turbine | wind turbine | 0.5 | approved, not builtupdated Apr 2024 | May 2022 | granted Mar 2024 | Apr 2024 |
| Somerby Farm, Lochussiewind turbine | wind turbine | 0.4 | refusedupdated Jul 2024 | Jan 2024 | refused May 2024 | Jul 2024 |
| Harbro Limited, Harbour Roadrooftop solar | rooftop solar | 0.4 | application submitted may be out of dateupdated Feb 2023 | Jan 2023 | — | Feb 2023 |
| Feed Millakinrooftop solar | rooftop solar | 0.3 | approved, not built may be out of dateupdated Jul 2023 | May 2023 | granted Jul 2023 | Jul 2023 |
| Scottish Water Challenger Estate - Ground Monted Solar Panelssolar farm | solar farm | 0.3 | approved, not builtupdated Mar 2026 | Nov 2025 | granted Jan 2026 | Mar 2026 |
| Loch Calder Water Treatment Works, Quarry Braesolar farm | solar farm | 0.3 | approved, not builtupdated May 2026 | Jan 2026 | granted Mar 2026 | May 2026 |
| Savalbeg WTWsolar farm | solar farm | 0.3 | application submittedupdated May 2026 | Apr 2026 | — | May 2026 |
| Lochaber High School (Resubmission)solar farm | solar farm | 0.3 | operationalupdated Dec 2019 | Jun 2019 | granted Aug 2019 | Dec 2019 |
| Inverness Royal Academyrooftop solar | rooftop solar | 0.3 | permission expiredupdated Mar 2020 | Mar 2020 | granted Sep 2020 | Mar 2020 |
| Wick Airport Industrial Estaterooftop solar | rooftop solar | 0.3 | approved, not built may be out of dateupdated Apr 2022 | Mar 2022 | granted Jun 2022 | Apr 2022 |
| West Clyth Farm, Occumsterwind turbine | wind turbine | 0.2 | approved, not builtupdated Oct 2023 | May 2023 | granted Oct 2023 | Oct 2023 |
| Invergordon Academysolar farm | solar farm | 0.2 | operationalupdated Nov 2019 | Jan 2019 | granted Feb 2019 | Nov 2019 |
| Lower Rumster wind turbinewind farm | wind farm | 0.2 | operationalupdated May 2022 | Jul 2020 | granted Oct 2020 | May 2022 |
| Raddery Smithy Solar PV System Installationsolar farm | solar farm | 0.1 | approved, not builtupdated Mar 2024 | Jan 2024 | granted Mar 2024 | Mar 2024 |
| Isle of Eigg Electrification Projectbattery storage | battery storage | 0.1 | operationalupdated Apr 2016 | — | — | Apr 2016 |
| Horse Island Microgrid Projectbattery storage | battery storage | — | operationalupdated Dec 2018 | — | — | Dec 2018 |
| Isle of Muck Microgrid Systembattery storage | battery storage | — | operationalupdated Oct 2018 | — | — | Oct 2018 |
| Isle of Rum Microgrid Projectbattery storage | battery storage | — | operationalupdated Dec 2018 | — | — | Dec 2018 |
| Kintradwell Lodge Wind Farm & Battery storagebattery storage | battery storage | — | refusedupdated Nov 2023 | Feb 2021 | refused Nov 2023 | Nov 2023 |
| Invershin Community Hall Wind Farm & Battery Storagebattery storage | battery storage | — | approved, not builtupdated Apr 2025 | Apr 2021 | granted Feb 2025 | Apr 2025 |
| Tigh Na Bradhan, Fasnakylebattery storage | battery storage | — | refusedupdated Nov 2025 | Sep 2023 | refused Oct 2025 | Nov 2025 |
| Cairnview, Bettyhillbattery storage | battery storage | — | approved, not builtupdated Feb 2026 | Jan 2023 | granted Feb 2024 | Feb 2026 |
| Mybster Croft, Spittalbattery storage | battery storage | — | approved, not builtupdated May 2025 | Nov 2023 | granted Mar 2025 | May 2025 |
| Strathrory Wind Farmbattery storage | battery storage | — | approved, not builtupdated Mar 2023 | Mar 2020 | granted Jan 2022 | Mar 2023 |
| Raigmore Hospital, Old Perth Road Solar Canopysolar farm | solar farm | — | approved, not builtupdated Nov 2023 | Sep 2023 | granted Nov 2023 | Nov 2023 |
| Slickly Wind Farmbattery storage | battery storage | — | approved, not builtupdated Oct 2023 | Jan 2020 | granted Aug 2022 | Oct 2023 |
| Knockbain Farmwind turbine | wind turbine | — | refusedupdated Jun 2025 | Oct 2024 | refused May 2025 | Jun 2025 |
| Cairn Duhie Wind Farmbattery storage | battery storage | — | approved, not builtupdated Feb 2026 | Mar 2021 | granted Feb 2024 | Feb 2026 |
| Creachan Wind Farm & BESSwind farm | wind farm | — | application submittedupdated Apr 2026 | Feb 2026 | — | Apr 2026 |
| Creachan Wind Farm & BESSbattery storage | battery storage | — | application submittedupdated Apr 2026 | Feb 2026 | — | Apr 2026 |
| Inveroykel Wind Farm Batterybattery storage | battery storage | — | application submittedupdated Apr 2026 | Feb 2026 | — | Apr 2026 |
| Shore Streetbattery storage | battery storage | — | approved, not builtupdated Jul 2025 | Dec 2024 | granted Jun 2025 | Jul 2025 |
| Wind Farm at 2040m Ne/O Bulreanrobwind farm | wind farm | — | application submittedupdated Jan 2026 | Dec 2025 | — | Jan 2026 |
| Golticlay Wind Farm, Bulreanrobbattery storage | battery storage | — | application submittedupdated Jan 2026 | Dec 2025 | — | Jan 2026 |
151 more projects not listed (furthest or smallest).
Postcode districts in Highland
| District | Projects within 10 km | Pending | Approved | Operational |
|---|---|---|---|---|
| IV1 | 11 | 4 | 4 | 0 |
| IV2 | 13 | 4 | 5 | 0 |
| IV3 | 11 | 4 | 4 | 0 |
| IV4 | 6 | 3 | 1 | 0 |
| IV5 | 6 | 3 | 1 | 0 |
| IV6 | 10 | 5 | 1 | 0 |
| IV7 | 7 | 2 | 1 | 0 |
| IV8 | 8 | 4 | 4 | 0 |
| IV9 | 7 | 4 | 3 | 0 |
| IV10 | 2 | 0 | 1 | 0 |
| IV11 | 4 | 0 | 0 | 1 |
| IV12 | 5 | 0 | 4 | 0 |
| IV13 | 17 | 8 | 1 | 4 |
| IV14 | 11 | 3 | 1 | 1 |
| IV15 | 8 | 2 | 1 | 0 |
| IV16 | 13 | 4 | 3 | 3 |
| IV17 | 12 | 2 | 5 | 3 |
| IV18 | 6 | 2 | 2 | 1 |
| IV19 | 2 | 0 | 1 | 0 |
| IV20 | 2 | 0 | 0 | 0 |
| IV21 | 0 | 0 | 0 | 0 |
| IV22 | 0 | 0 | 0 | 0 |
| IV23 | 0 | 0 | 0 | 0 |
| IV24 | 4 | 3 | 0 | 1 |
| IV25 | 2 | 0 | 1 | 0 |
| IV26 | 1 | 1 | 0 | 0 |
| IV27 | 0 | 0 | 0 | 0 |
| IV28 | 4 | 0 | 0 | 1 |
| IV40 | 1 | 0 | 1 | 0 |
| IV41 | 1 | 0 | 1 | 0 |
| IV42 | 1 | 0 | 1 | 0 |
| IV43 | 0 | 0 | 0 | 0 |
| IV44 | 0 | 0 | 0 | 0 |
| IV45 | 0 | 0 | 0 | 0 |
| IV46 | 2 | 2 | 0 | 0 |
| IV47 | 4 | 3 | 0 | 0 |
| IV48 | 0 | 0 | 0 | 0 |
| IV49 | 0 | 0 | 0 | 0 |
| IV51 | 0 | 0 | 0 | 0 |
| IV52 | 1 | 0 | 1 | 0 |
| IV53 | 0 | 0 | 0 | 0 |
| IV54 | 0 | 0 | 0 | 0 |
| IV55 | 2 | 0 | 0 | 2 |
| IV56 | 9 | 4 | 1 | 2 |
| IV63 | 6 | 3 | 2 | 0 |
| KW1 | 8 | 0 | 1 | 6 |
| KW2 | 8 | 2 | 2 | 3 |
| KW3 | 14 | 4 | 2 | 3 |
| KW5 | 14 | 4 | 2 | 2 |
| KW6 | 8 | 2 | 0 | 2 |
| KW7 | 2 | 0 | 0 | 0 |
| KW8 | 4 | 0 | 0 | 0 |
| KW9 | 4 | 0 | 0 | 2 |
| KW10 | 4 | 0 | 0 | 3 |
| KW11 | 0 | 0 | 0 | 0 |
| KW12 | 25 | 6 | 8 | 2 |
| KW13 | 5 | 2 | 1 | 1 |
| KW14 | 21 | 2 | 7 | 5 |
| PA80 | 0 | 0 | 0 | 0 |
| PH19 | 0 | 0 | 0 | 0 |
| PH20 | 0 | 0 | 0 | 0 |
| PH21 | 0 | 0 | 0 | 0 |
| PH22 | 1 | 0 | 0 | 0 |
| PH23 | 4 | 2 | 0 | 0 |
| PH24 | 1 | 0 | 0 | 0 |
| PH25 | 1 | 0 | 0 | 0 |
| PH26 | 0 | 0 | 0 | 0 |
| PH30 | 0 | 0 | 0 | 0 |
| PH31 | 1 | 1 | 0 | 0 |
| PH32 | 7 | 0 | 2 | 2 |
| PH33 | 2 | 0 | 0 | 1 |
| PH34 | 1 | 1 | 0 | 0 |
| PH35 | 11 | 4 | 2 | 5 |
| PH36 | 0 | 0 | 0 | 0 |
| PH37 | 0 | 0 | 0 | 0 |
| PH38 | 0 | 0 | 0 | 0 |
| PH39 | 0 | 0 | 0 | 0 |
| PH40 | 0 | 0 | 0 | 0 |
| PH41 | 0 | 0 | 0 | 0 |
| PH42 | 2 | 0 | 0 | 2 |
| PH43 | 1 | 0 | 0 | 1 |
| PH44 | 0 | 0 | 0 | 0 |
| PH49 | 0 | 0 | 0 | 0 |
| PH50 | 0 | 0 | 0 | 0 |
32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Projects belong to Highland by location (nearest postcode to the REPD grid reference); decisions are counted by the planning authority named in REPD.