Energy Projects Near You

Wind Turbines at Kyllachy Wind Farm (78 MW)

Wind Turbines at Kyllachy Wind Farm is a 78 MW wind farm project in Highland, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 5 September 2025, no decision recorded; the record was last updated on 13 October 2025. As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

78 MWwind farm
application submittedstatus in REPD
13 October 2025record last updated
Highlandcouncil area

Planning timeline

DateStage
5 September 2025Application submitted

Project details

Technology
wind farm
Capacity
78 MW
Status (REPD)
application submitted
Record last updated
13 October 2025
Operator or applicant
Wind Estate (UK) Limited
Planning authority
Scottish Government (S36)
Planning application reference
ECU00005153
Turbines
13
Turbine height
180 m
Address (REPD)
Kyllachy Wind Farm, Approximately 4km SW/O Tomatin & N/O Kyllachy Estate, Tomatin
Council area (by location)
Highland
Name in REPD
Kyllachy Wind Farm - Wind Turbines
REPD reference
16784

Recorded together with Kyllachy Wind Farm (22 MW battery storage, application submitted).

Who decides

As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. Scottish Government (S36) refused 18% of 334 decided solar, wind and battery applications in REPD (median 127 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Farr Wind Farmwind farm92operational3.5
Glen Kyllachy Wind Farmwind farm48.5operational5.0
Corriegarth 2wind farm67.2approved, not built6.8
Carr Ban Wind Farmwind farm23.8application withdrawn7.0
Daviot Wind Farmwind farm32.5refused on appeal7.8
Tomatinwind farm25.5refused8.3
Moy Wind Farmwind farm40abandoned8.5
Moy Wind Farm (2nd Application)wind farm66operational8.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (57.3412, -4.1598).