Scoolary (120 MW wind farm)

Scoolary is a 120 MW wind farm project in Highland, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 16 April 2008; the record was last updated on 16 April 2008. As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

120 MWwind farm
application withdrawnstatus in REPD
16 April 2008record last updated
Highlandcouncil area

Planning timeline

DateStage
16 April 2008Application withdrawn

Project details

Technology
wind farm
Capacity
120 MW
Status (REPD)
application withdrawn
Record last updated
16 April 2008
Operator or applicant
British Energy
Planning authority
Scottish Government (S36)
Planning application reference
not recorded
Turbines
48
Address (REPD)
Scoolary Caithness
Council area (by location)
Highland
REPD reference
3206

Who decides

As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. Scottish Government (S36) refused 18% of 334 decided solar, wind and battery applications in REPD (median 127 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Hollandmey Renewable Energy Developmentwind farm50approved, not built1.8
Hollandmey Renewable Energy Developmentsolar farm15approved, not built1.8
Lochend Wind Farmwind farm9.2operational2.8
Lochend Holding, Barrock Wind Farmwind farm21application submitted2.8
Lochend Holding, Barrock Wind Farmbattery storage10application submitted2.8
Lyth Wind Farmwind farm24refused on appeal3.0
Slickly Wind Farmwind farm49.9approved, not built3.5
Philips Mains, Meybattery storage300approved, not built4.3
Hill of Stroupster Windfarmwind farm29.9operational5.2

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (58.5987, -3.2147).