Ora More Extension (6 MW wind farm)

Ora More Extension is a 6 MW wind farm project in Fermanagh and Omagh, Northern Ireland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: planning permission expired on 17 December 2020; the record was last updated on 25 June 2020.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

6 MWwind farm
permission expiredstatus in REPD
25 June 2020record last updated
Fermanagh and Omaghcouncil area

Planning timeline

DateStage
21 November 2013Application submitted
17 December 2015Planning permission granted
17 December 2020Permission expired

Project details

Technology
wind farm
Capacity
6 MW
Status (REPD)
permission expired
Record last updated
25 June 2020
Operator or applicant
Renewable Energy Systems (RES)
Planning authority
Fermanagh and Omagh
Planning application reference
L/2013/0625/F
Turbines
3
Address (REPD)
Ora More Hill, in the Townlands of Killycreen East, Ora Beg and Mullylusty, near Boho and Belcoo, Co Fermanagh.
Council area (by location)
Fermanagh and Omagh
Time to decision
108 weeks
REPD reference
4282

Who decides

ApplicationsFermanagh and OmaghUK
Decided applications (solar, wind, battery)7410,236
Refused12 (16%)19%
Solar refused0 of 112%
Onshore wind refused12 of 7045%
Battery storage refused0 of 316%
Median time from submission to decision87.9 weeks17.0 weeks
Appeals lodged / allowed8 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
Ora Morewind farm15operational<0.1
Belmore Mountainwind farm30application withdrawn3.8
Tullinoidwind farm6application withdrawn9.3

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.3385, -7.8959).