Pant y wal extension (20 MW wind farm)

Pant y wal extension is a 20 MW wind farm project in Bridgend, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 1 May 2017; the record was last updated on 21 August 2017.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

20 MWwind farm
operationalstatus in REPD
21 August 2017record last updated
Bridgendcouncil area

Planning timeline

DateStage
30 April 2014Application submitted
2 April 2015Planning permission granted
14 March 2016Construction started
1 May 2017Operational

Project details

Technology
wind farm
Capacity
20 MW
Status (REPD)
operational
Record last updated
21 August 2017
Operator or applicant
Pennant Walters (PYWX)
Planning authority
Bridgend
Planning application reference
P/14/293/FUL
Turbines
8
Turbine height
125 m
Address (REPD)
Mynydd Maesteg, Mynydd Pwlle yr Helog, Ogmore Vale, Rhondda Valley
Council area (by location)
Bridgend
Time to decision
48 weeks
REPD reference
4409

Who decides

ApplicationsBridgendUK
Decided applications (solar, wind, battery)1910,236
Refused7 (37%)19%
Solar refused1 of 812%
Onshore wind refused6 of 1045%
Battery storage refused0 of 116%
Median time from submission to decision23.7 weeks17.0 weeks
Appeals lodged / allowed1 / 3—

Other large projects within 10 km

ProjectTypeMWStatuskm
Pant y Wal (Extension)wind farm5approved, not built2.3
Fforch Nest Wind Farm pt2wind farm17.5operational2.8
Pant y walwind farm25operational3.1
Fforch Nest Wind Farmwind farm16abandoned3.3
Fforch Nest Wind Farm pt1wind farm10operational3.3
Trane Renewable Energy Parkwind farm11.9application withdrawn4.1
Headwind Taff Ely Wind Farm (Repowering)wind farm17.5permission expired4.3
Taff Ely Wind Farmwind farm9operational4.4
Mynydd Pen-y-Graig Wind Farmwind farm15application withdrawn4.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.5872, -3.522).