Vauls Farm, Astley Lane Solar Farm (16 MW)

Vauls Farm, Astley Lane Solar Farm is a 16 MW solar farm project in North Warwickshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 19 July 2023, not yet built; the record was last updated on 4 August 2023. REPD records the planning permission as expiring on 19 July 2026, but the project holds a Contracts for Difference award (AR6), so construction may have started. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

16 MWsolar farm
approved, not builtmay be out of datestatus in REPD
4 August 2023record last updated
North Warwickshirecouncil area

REPD records the planning permission as expiring on 19 July 2026, but the project holds a Contracts for Difference award (AR6), so construction may have started.

Planning timeline

DateStage
25 October 2022Application submitted
19 July 2023Planning permission granted
19 July 2026Permission expired

Project details

Technology
solar farm
Capacity
16 MW
Status (REPD)
approved, not built
Record last updated
4 August 2023
Operator or applicant
Industria Solar Bedworth Limited
Planning authority
North Warwickshire
Planning application reference
PAP/2022/0544
Site area
28.0 ha
Address (REPD)
550 Metres E/O Vauls Farm Astley Lane Astley
Council area (by location)
North Warwickshire
Time to decision
38 weeks
Contracts for Difference
AR6
Name in REPD
Vauls Farm, Astley Lane - Solar Farm
REPD reference
12647

Who decides

ApplicationsNorth WarwickshireUK
Decided applications (solar, wind, battery)3210,236
Refused3 (9%)19%
Solar refused2 of 2312%
Onshore wind refused1 of 145%
Battery storage refused0 of 816%
Median time from submission to decision16.4 weeks17.0 weeks
Appeals lodged / allowed2 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Newgate Coolliery Solar Farm & Battery Storagesolar farm6application submitted1.7
Corley Smorral Lane - Photovoltaic Solar Arrayssolar farm16.5approved, not built1.8
Park Lane, Astley Solar PV Farmsolar farm30approved, not built2.8
Mcdonnell Drive, Exhallbattery storage30approved, not built3.8
Park House Farm, Meriden Road Solar Farmsolar farm47.7approved, not built5.0
Land South of Pogmore Spinneysolar farm5operational5.1
Hollyhurst Farm, Mile Tree Lanesolar farm25.6application submitted5.5
Coventry National Grid Substationbattery storage49.9operational5.5
Coventry National Grid Substation, Hawkesbury Hallbattery storage98application submitted5.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.4864, -1.5257).