Wittering Ford Road, Barnack Solar Photovoltaic Farm (11 MW)
Wittering Ford Road, Barnack Solar Photovoltaic Farm is an 11 MW solar farm project in Peterborough, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 15 November 2023, not yet built; the record was last updated on 24 November 2023.
11 MWsolar farm
approved, not builtstatus in REPD
24 November 2023record last updated
Peterboroughcouncil area
Planning timeline
| Date | Stage |
|---|---|
| 25 July 2023 | Application submitted |
| 15 November 2023 | Planning permission granted |
| 15 November 2026 | Permission due to expire (unless work starts) |
Project details
- Technology
- solar farm
- Capacity
- 11 MW
- Status (REPD)
- approved, not built
- Record last updated
- 24 November 2023
- Operator or applicant
- Larkfleet limited
- Planning authority
- Peterborough
- Planning application reference
- 23/00829/FUL
- Site area
- 13.0 ha
- Address (REPD)
- Wittering Ford Road, Barnack, Stamford
- Council area (by location)
- Peterborough
- Time to decision
- 16 weeks
- Name in REPD
- Wittering Ford Road, Barnack - Solar Photovoltaic Farm
- REPD reference
- 13389
Who decides
| Applications | Peterborough | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 35 | 10,236 |
| Refused | 6 (17%) | 19% |
| Solar refused | 0 of 19 | 12% |
| Onshore wind refused | 6 of 6 | 45% |
| Battery storage refused | 0 of 10 | 16% |
| Median time from submission to decision | 12.9 weeks | 17.0 weeks |
| Appeals lodged / allowed | 1 / 3 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Mallard Pass Solar Farm | solar farm | 350 | approved, not built | 8.6 |
| Ketton solar farm | solar farm | 9 | operational | 9.5 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.6148, -0.4268).