Solar, wind and battery projects near Wemyss Bay (PA18)

10 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of PA18 (Inverclyde): 1 is waiting for a planning decision, 4 approved but not yet running. The largest live scheme is Flatterton Farm, Flatterton Road (49.9 MW battery storage, approved on 5 June 2024, not yet built), 5.9 km away. Source: Renewable Energy Planning Database, July 2026 extract.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

10projects within 10 km
1awaiting a decision
4approved, not running
0operational

Projects within 10 km of PA18

Projects of 1 MW and more (7)

ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Berfern Farmbattery storagebattery storage5permission expiredupdated Jul 2020May 2018—Jul 2020Inverclyde1.8
Leapmoor Forestwind farmwind farm30application withdrawnupdated Mar 2011Jul 2006—Mar 2011Inverclyde2.7
Kip Water Hydro Schemebattery storagebattery storage1application submitted may be out of dateupdated Dec 2018Oct 2018—Dec 2018Inverclyde3.8
Rigghill Wind Farmwind farmwind farm42refusedupdated May 2021Apr 2020refused Mar 2021May 2021North Ayrshire4.2
Flatterton Farm, Flatterton Roadbattery storagebattery storage49.9approved, not builtupdated Jun 2024Oct 2023granted Jun 2024Jun 2024Inverclyde5.9
Corlarach Hillwind farmwind farm42refused on appealupdated Dec 2010Jun 2007refused Jan 2008Dec 2010Argyll and Bute7.5
Waterhead Moorwind farmwind farm72.5application withdrawnupdated Oct 2011Sep 2010—Oct 2011North Ayrshire7.8
Smaller schemes under 1 MW, mostly rooftop solar (3)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Faulds Park Road- Solar PV Panlelsrooftop solarrooftop solar0.3under constructionupdated Apr 2022Apr 2022granted Jul 2022Apr 2022Inverclyde6.4
Overton Water Treatment Works, Old Largs Road By Overtonrooftop solarrooftop solar0.6approved, not built may be out of dateupdated Mar 2023Nov 2022granted Jan 2023Mar 2023Inverclyde9.3
Greenock Headworks, Eldon Streetrooftop solarrooftop solar0.2approved, not built may be out of dateupdated Jan 2023Oct 2022granted Dec 2022Jan 2023Inverclyde10.0

Distance from the average position of the PA18 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.

By type

TypeAllPendingApprovedOperationalRefusedMW in pipeline
Rooftop solar303001.2
Wind farm400020
Battery storage3110050.9

MW in pipeline: pending, approved and under-construction capacity.

How Inverclyde decides solar, wind and battery applications

ApplicationsInverclydeUK
Decided applications (solar, wind, battery)1010,236
Refused2 (20%)19%
Solar refused0 of 612%
Onshore wind refused2 of 245%
Battery storage refused0 of 216%
Median time from submission to decision12.1 weeks17.0 weeks
Appeals lodged / allowed1 / 1—

All projects in Inverclyde

Is the status up to date?

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near PA18, 3 projects have a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.