Energy Projects Near You

Solar, wind and battery projects near Southend-on-Sea (SS1)

16 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of SS1 (Southend-on-Sea): 2 are waiting for a planning decision, 9 approved but not yet running, 2 operational. The largest live scheme is Bolt Hall Farm, Lark Hill Road Solar Photovoltaic Farm. (50 MW solar farm, application submitted on 23 August 2023, no decision recorded; REPD status may be out of date), 9.4 km away. Offshore, 4 wind farms are recorded within 40 km; the nearest is Kentish Flats 2 (49.5 MW, operational), 26.0 km away. Source: Renewable Energy Planning Database, July 2026 extract.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

16projects within 10 km
2awaiting a decision
9approved, not running
2operational

Projects within 10 km of SS1

Projects of 1 MW and more (7)

ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Campfield Road, Shoeburynessrooftop solarrooftop solar1approved, not builtupdated Feb 2024Dec 2023granted Jan 2024Feb 2024Southend-on-Sea4.1
London Southend Airportsolar farmsolar farm2.5operationalupdated Dec 2017Mar 2015granted May 2015Dec 2017Rochford5.0
Canewdon Road, Canewdon Solar Photovoltaic Farmsolar farmsolar farm49.9approved, not builtupdated Jan 2024May 2023granted Jan 2024Jan 2024Rochford8.6
Bolt Hall Farm, Lark Hill Road Solar Photovoltaic Farm.solar farmsolar farm50application submitted may be out of dateupdated Feb 2026Aug 2023—Feb 2026Rochford9.4
Fambridge Road/Canewdon Roadsolar farmsolar farm5operationalupdated Feb 2016Oct 2014granted Apr 2015Feb 2016Rochford9.5
Fambridge Road/Canewdon Roadsolar farmsolar farm5permission expiredupdated Aug 2018Oct 2014granted Apr 2015Aug 2018Rochford9.5
Perry's Farm Wind Farmwind farmwind farm6.8refusedupdated May 2016Jun 2015refused Jan 2016May 2016Medway9.8
Smaller schemes under 1 MW, mostly rooftop solar (9)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Sea Life Adventure Centre, Eastern Esplanaderooftop solarrooftop solar0.2approved, not builtupdated Apr 2023Mar 2023granted Apr 2023Apr 2023Southend-on-Sea0.7
Adventure Island, Western Esplanade Solar Arraysrooftop solarrooftop solar0.1approved, not builtupdated Mar 2025Jan 2025granted Feb 2025Mar 2025Southend-on-Sea1.2
Sainsburys Supermarkets, London Roadrooftop solarrooftop solar0.2approved, not builtupdated Jun 2025Mar 2025granted May 2025Jun 2025Southend-on-Sea1.6
Spire Wellesley Hospital, Eastern Avenuerooftop solarrooftop solar0.2approved, not builtupdated Jan 2025May 2024granted Dec 2024Jan 2025Southend-on-Sea1.9
David Lloyd Health And Fitness Centre, Snakes Lanerooftop solarrooftop solar0.5application submitted may be out of dateupdated Jul 2023Jul 2023—Jul 2023Southend-on-Sea5.3
Rochford Hospital, Union Lanerooftop solarrooftop solar0.3refusedupdated May 2026Feb 2026refused Mar 2026May 2026Rochford5.5
Clements Hall Leisure Centre, Clements Hall Wayrooftop solarrooftop solar0.2approved, not builtupdated Jan 2025Oct 2024granted Nov 2024Jan 2025Rochford7.6
London Road, Hadleighrooftop solarrooftop solar0.3approved, not builtupdated Feb 2024Dec 2023granted Feb 2024Feb 2024Castle Point8.8
Castle View School, Foksville Roadrooftop solarrooftop solar0.3approved, not builtupdated Aug 2024Jun 2024granted Jul 2024Aug 2024Castle Point9.6

Distance from the average position of the SS1 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.

By type

TypeAllPendingApprovedOperationalRefusedMW in pipeline
Solar farm5112099.8
Rooftop solar1018013.1
Wind farm100010

MW in pipeline: pending, approved and under-construction capacity.

Offshore wind farms within 40 km

Wind farmMWStatus (REPD)km
Kentish Flats 249.5operationalupdated Jun 201626.0
Kentish Flats90operationalupdated Oct 201726.5
Gunfleet Sands - (Demo) Extension12operationalupdated Nov 201736.7
Gunfleet Sands Offshore Wind Scheme108operationalupdated May 201839.9

Operational, approved and pending offshore wind farms; distance from the district centre to the REPD grid reference of each wind farm (one point per site, so the nearest turbines can be closer or further). All offshore wind farms in UK waters.

How Southend-on-Sea decides solar, wind and battery applications

Southend-on-Sea has 5 decided solar, wind or battery applications in REPD — too few for a refusal rate (we show one from 10 decisions). Across all UK planning authorities 19% of 10,236 decisions were refusals.

All projects in Southend-on-Sea

Is the status up to date?

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near SS1, 2 projects have a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.