Solar, wind and battery projects near Tenbury Wells (WR15)

6 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of WR15 (Malvern Hills): 1 is waiting for a planning decision, 2 approved but not yet running, 1 operational. The largest live scheme is The Waddings, Knighton-On-Teme (60 MW battery storage, application submitted on 4 December 2024, no decision recorded), 3.1 km away. Source: Renewable Energy Planning Database, July 2026 extract.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

6projects within 10 km
1awaiting a decision
2approved, not running
1operational

Projects within 10 km of WR15

Projects of 1 MW and more (4)

ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
The Waddings, Knighton-On-Temebattery storagebattery storage60application submittedupdated Jan 2025Dec 2024—Jan 2025Malvern Hills3.1
Brick House Farm Solar Farmsolar farmsolar farm49.9approved, not built may be out of dateupdated Sep 2025Jun 2022granted Oct 2022Sep 2025Shropshire4.8
Land at High Point Farmsolar farmsolar farm4.5operationalupdated Apr 2017Oct 2014granted Mar 2016Apr 2017Shropshire6.1
Whitton Solar Farmsolar farmsolar farm8.6refused on appealupdated Jul 2016Mar 2015refused Jul 2015Jul 2016Shropshire7.5
Smaller schemes under 1 MW, mostly rooftop solar (2)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Kerry Ingredients & Flavoursrooftop solarrooftop solar0.3under constructionupdated Jun 2023——Jun 2023Shropshire2.2
Kerry Ingredients, Clee Hill Road - Food Processing Plantrooftop solarrooftop solar0.3no application requiredupdated Jul 2022——Jul 2022Shropshire2.5

Distance from the average position of the WR15 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.

By type

TypeAllPendingApprovedOperationalRefusedMW in pipeline
Solar farm3011149.9
Rooftop solar201000.3
Battery storage1100060

MW in pipeline: pending, approved and under-construction capacity.

How Malvern Hills decides solar, wind and battery applications

ApplicationsMalvern HillsUK
Decided applications (solar, wind, battery)1410,236
Refused7 (50%)19%
Solar refused5 of 1012%
Onshore wind refused1 of 245%
Battery storage refused1 of 216%
Median time from submission to decision20.6 weeks17.0 weeks
Appeals lodged / allowed2 / 1—

All projects in Malvern Hills

Is the status up to date?

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near WR15, 1 project has a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.