Whitton Solar Farm (8.6 MW)

Whitton Solar Farm is an 8.6 MW solar farm project in Shropshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on appeal on 7 June 2016; the record was last updated on 1 July 2016.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

8.6 MWsolar farm
refused on appealstatus in REPD
1 July 2016record last updated
Shropshirecouncil area

Planning timeline

DateStage
19 March 2015Application submitted
1 July 2015Refused by the planning authority
2 February 2016Appeal lodged
7 June 2016Appeal refused

Project details

Technology
solar farm
Capacity
8.6 MW
Status (REPD)
refused on appeal
Record last updated
1 July 2016
Operator or applicant
EBS Energy LLP
Planning authority
Shropshire
Planning application reference
15/01238/FUL
Appeal reference
APP/L3245/W/15/3141378
Site area
17.4 ha
Address (REPD)
Whitton Solar Farm, Caynham, Ludlow,
Council area (by location)
Shropshire
Time to decision
15 weeks
REPD reference
5127

Earlier applications for this site

ApplicationMWSubmittedOutcome
Whitton solar farm 14/02873/FUL8.630 June 2014refused 27 October 2014

Who decides

ApplicationsShropshireUK
Decided applications (solar, wind, battery)9810,236
Refused22 (22%)19%
Solar refused20 of 7812%
Onshore wind refused2 of 345%
Battery storage refused0 of 1716%
Median time from submission to decision15.2 weeks17.0 weeks
Appeals lodged / allowed10 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
Squirrel Lane Solar Photovoltaic Farmsolar farm12operational2.8
Brick House Farm Solar Farmsolar farm49.9approved, not built2.9
South of Henley Hallsolar farm5operational3.6
Steventon Roadbattery storage23approved, not built4.3
Rock Farm Solar Farmsolar farm40under construction4.6
Rock Farm Solar Farmbattery storage12under construction4.6
The Waddings, Knighton-On-Temebattery storage60application submitted7.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.3569, -2.6409).