Back Lane Solar Farm (5 MW)

Back Lane Solar Farm is a 5 MW solar farm project in Sefton, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: appeal withdrawn; the record was last updated on 30 August 2018.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

5 MWsolar farm
appeal withdrawnstatus in REPD
30 August 2018record last updated
Seftoncouncil area

Planning timeline

DateStage
28 July 2015Application submitted
9 October 2015Refused by the planning authority
5 April 2016Appeal lodged
24 May 2016Appeal withdrawn

Project details

Technology
solar farm
Capacity
5 MW
Status (REPD)
appeal withdrawn
Record last updated
30 August 2018
Operator or applicant
BE Renewables
Planning authority
West Lancashire
Planning application reference
2015/0759/FUL
Appeal reference
APP/P2365/W/16/3146719
Site area
14.5 ha
Address (REPD)
Land To The West Of, Back Lane, Aughton, Ormskirk,
Council area (by location)
Sefton
Time to decision
10 weeks
REPD reference
5936

Earlier applications for this site

ApplicationMWSubmittedOutcome
Back Lane Solar Farm 2015/0424/FUL529 April 2015withdrawn 9 July 2015

Who decides

ApplicationsWest LancashireUK
Decided applications (solar, wind, battery)2410,236
Refused6 (25%)19%
Solar refused5 of 1612%
Onshore wind refused1 of 345%
Battery storage refused0 of 516%
Median time from submission to decision11.4 weeks17.0 weeks
Appeals lodged / allowed4 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Fromby Lane Solar Farmsolar farm5appeal withdrawn1.2
Gerard Hall Solar Farmsolar farm17refused on appeal2.7
Lower Alt Wind Farmwind farm42refused3.7
Land at Tip Fieldsolar farm5under construction6.8
Jemmys Carrsolar farm5under construction6.8
Orrell Hillsolar farm20refused7.1
North Moss Lane Solar Photovoltaic Farmsolar farm9approved, not built7.4
Ringtail Airfieldsolar farm5application withdrawn7.4
Avondale Nurseries, Spa Lanebattery storage320approved, not built7.8

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.5417, -2.9377).