Brockaghboy Wind Farm (Further Extension) (10 MW)
Brockaghboy Wind Farm (Further Extension) is a 10 MW wind farm project in Mid Ulster, Northern Ireland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 25 August 2020, not yet built; the record was last updated on 15 September 2020. REPD also records that the planning permission expired on 14 September 2025, so the project may not go ahead in this form. Check the planning authority's register for the latest position.
REPD also records that the planning permission expired on 14 September 2025, so the project may not go ahead in this form.
Planning timeline
| Date | Stage |
|---|---|
| 14 October 2019 | Application submitted |
| 25 August 2020 | Planning permission granted |
| 14 September 2025 | Permission expired |
Project details
- Technology
- wind farm
- Capacity
- 10 MW
- Status (REPD)
- approved, not built
- Record last updated
- 15 September 2020
- Operator or applicant
- Brockaghboy Windfarm
- Planning authority
- Mid Ulster
- Planning application reference
- LA09/2019/1386/F
- Turbines
- 4
- Turbine height
- 125 m
- Address (REPD)
- Brockaghboy Wind Farm, 10A Drumbane Road, Garvagh, south east of Dowlin's Bridge, Coleraine, Co Londonderry
- Council area (by location)
- Mid Ulster
- Time to decision
- 45 weeks
- REPD reference
- 7640
Who decides
| Applications | Mid Ulster | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 49 | 10,236 |
| Refused | 8 (16%) | 19% |
| Solar refused | 0 of 9 | 12% |
| Onshore wind refused | 8 of 33 | 45% |
| Battery storage refused | 0 of 7 | 16% |
| Median time from submission to decision | 68.9 weeks | 17.0 weeks |
| Appeals lodged / allowed | 5 / 1 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Corlacky Hill Wind Farm | wind farm | 36.3 | approved, not built | 3.5 |
| Brockaghboy Wind Farm | wind farm | 37.5 | operational | 6.2 |
| Upper Ballyrogan Wind Farm | wind farm | 11.5 | abandoned | 7.7 |
| Evishagaran Wind Farm | wind farm | 46.8 | approved, not built | 7.7 |
| Brishey Wind Farm | wind farm | 28.8 | application submitted | 8.6 |
| Craiggore windfarm | wind farm | 23.5 | operational | 8.8 |
| Smulgedon | wind farm | 16.1 | abandoned | 9.1 |
| Brockaghboy Wind Farm - extension | wind farm | 10 | operational | 9.9 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.9298, -6.7231).