Broken Cross (Former Surface Mine) (48 MW wind farm)

Broken Cross (Former Surface Mine) is a 48 MW wind farm project in South Lanarkshire, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 1 October 2024; the record was last updated on 16 January 2026.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

48 MWwind farm
operationalstatus in REPD
16 January 2026record last updated
South Lanarkshirecouncil area

Planning timeline

DateStage
30 October 2019Application submitted
21 April 2020Planning permission granted
1 July 2023Construction started
1 October 2024Operational

Project details

Technology
wind farm
Capacity
48 MW
Status (REPD)
operational
Record last updated
16 January 2026
Operator or applicant
BayWa r.e. UK Limited
Planning authority
South Lanarkshire
Planning application reference
P/19/1636
Turbines
10
Turbine height
150 m
Address (REPD)
Former Surface Mine, Tower Road, Douglas, Broken Cross, Lanark, Strathclyde
Council area (by location)
South Lanarkshire
Time to decision
25 weeks
Contracts for Difference
AR4
REPD reference
6708

Who decides

ApplicationsSouth LanarkshireUK
Decided applications (solar, wind, battery)8910,236
Refused30 (34%)19%
Solar refused2 of 2012%
Onshore wind refused21 of 5645%
Battery storage refused7 of 1316%
Median time from submission to decision47.4 weeks17.0 weeks
Appeals lodged / allowed6 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
Coalburn II Energy Storage Facilitybattery storage1,000under construction0.6
Central Eco Park Solar Farmsolar farm12approved, not built1.6
Coalburn Energybattery storage500under construction2.1
High Netherfauld House Farm 1, Tower Roadbattery storage502application submitted2.4
Poniel Wind Turbineswind farm9application withdrawn2.9
Cumberhead West Wind Farmwind farm126under construction4.5
Carlisle Roadbattery storage200approved, not built4.8
Douglas West Wind Farm (extension)wind farm78under construction5.0
Douglas West and Dalquhandy Renewable Energy Projectwind farm45operational5.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.6045, -3.8162).