Bullington Cross Wind Farm (Basingstoke and Deane) (8 MW)

Bullington Cross Wind Farm (Basingstoke and Deane) is an 8 MW wind farm project in Winchester, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: appeal withdrawn; the record was last updated on 17 July 2015.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

8 MWwind farm
appeal withdrawnstatus in REPD
17 July 2015record last updated
Winchestercouncil area

Planning timeline

DateStage
8 April 2013Application submitted
17 June 2014Refused by the planning authority
26 January 2015Appeal lodged
13 July 2015Appeal withdrawn

Project details

Technology
wind farm
Capacity
8 MW
Status (REPD)
appeal withdrawn
Record last updated
17 July 2015
Operator or applicant
EDF
Planning authority
Winchester
Planning application reference
13/00046/FUL
Appeal reference
APP/H1705/W/14/3001603
Turbines
4
Address (REPD)
Land At Bullington Cross, Upper Norton Farm, Sutton Scotney, Hants
Council area (by location)
Winchester
Time to decision
62 weeks
REPD reference
4096

Who decides

ApplicationsWinchesterUK
Decided applications (solar, wind, battery)3710,236
Refused4 (11%)19%
Solar refused0 of 2412%
Onshore wind refused3 of 345%
Battery storage refused1 of 1016%
Median time from submission to decision14.7 weeks17.0 weeks
Appeals lodged / allowed3 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Bullington Cross Wind Farm (7 of 14 turbines Winchester City Council)wind farm14appeal withdrawn<0.1
Bullington Cross Wind Farm (3 of 14 turbines Test Valley BC)wind farm6appeal withdrawn<0.1
Owls Lodge Farm Extensionsolar farm5operational3.9
Owls Lodge Farmsolar farm5operational4.3
Three Maids Hill Solar Farmsolar farm25operational8.7
Lower Wyke Farm, St Mary Bourne Solar Farmsolar farm21approved, not built9.0
Woodmancott Downwind farm18refused9.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.1887, -1.3118).