Lower Wyke Farm, St Mary Bourne Solar Farm (21 MW)

Lower Wyke Farm, St Mary Bourne Solar Farm is a 21 MW solar farm project in Basingstoke and Deane, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 11 June 2026, not yet built; the record was last updated on 13 July 2026.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

21 MWsolar farm
approved, not builtstatus in REPD
13 July 2026record last updated
Basingstoke and Deanecouncil area

Planning timeline

DateStage
8 August 2023Application submitted
30 June 2025Refused by the planning authority
8 December 2025Appeal lodged
11 June 2026Planning permission granted
11 June 2026Appeal allowed
11 June 2029Permission due to expire (unless work starts)

Project details

Technology
solar farm
Capacity
21 MW
Status (REPD)
approved, not built
Record last updated
13 July 2026
Operator or applicant
British Solar Renewables
Planning authority
Basingstoke and Deane
Planning application reference
23/02000/FUL
Appeal reference
25/00077/REF
Site area
36.7 ha
Address (REPD)
Lower Wyke Farm Lower Wyke St Mary Bourne Andover
Council area (by location)
Basingstoke and Deane
Time to decision
148 weeks
Name in REPD
Lower Wyke Farm, St Mary Bourne - Solar Farm
REPD reference
10973

Who decides

ApplicationsBasingstoke and DeaneUK
Decided applications (solar, wind, battery)3010,236
Refused8 (27%)19%
Solar refused5 of 2212%
Onshore wind refused1 of 145%
Battery storage refused2 of 716%
Median time from submission to decision26.3 weeks17.0 weeks
Appeals lodged / allowed4 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
South Way, Walworth Business Park Solar Photovoltaicsrooftop solar5.2application withdrawn3.4
Cowdown Lanesolar farm40operational5.4
Owls Lodge Farm Extensionsolar farm5operational6.4
Owls Lodge Farmsolar farm5operational6.5
Hatherden Farmsolar farm49.9operational6.7
Winchester Road, Wherwell Solar Farmsolar farm45.9approved, not built7.4
Andover Solar Farmsolar farm5operational8.8
Bullington Cross Wind Farm (Basingstoke and Deane)wind farm8appeal withdrawn9.0
Bullington Cross Wind Farm (3 of 14 turbines Test Valley BC)wind farm6appeal withdrawn9.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.2365, -1.4161).