Butterfly Lane, Elstree BESS (99.9 MW)

Butterfly Lane, Elstree BESS is a 99.9 MW battery storage project in Hertsmere, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused; appeal lodged on 31 March 2026; the record was last updated on 8 June 2026.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

99.9 MWbattery storage
appeal lodgedstatus in REPD
8 June 2026record last updated
Hertsmerecouncil area

Planning timeline

DateStage
18 July 2025Application submitted
31 March 2026Appeal lodged

Project details

Technology
battery storage (stand-alone storage)
Capacity
99.9 MW
Status (REPD)
appeal lodged
Record last updated
8 June 2026
Operator or applicant
Greenfield Energy Developments Limited
Planning authority
Hertsmere
Planning application reference
25/1070/FUL
Appeal reference
26/0016/APP
Address (REPD)
Opp Jnct With Butterfly Lane, E/O Watling Street, Radlett
Council area (by location)
Hertsmere
Name in REPD
Butterfly Lane, Elstree BESS - Battery Energy Storage System
REPD reference
19441

Who decides

ApplicationsHertsmereUK
Decided applications (solar, wind, battery)1610,236
Refused4 (25%)19%
Solar refused2 of 1312%
Battery storage refused2 of 316%
Median time from submission to decision11.4 weeks17.0 weeks
Appeals lodged / allowed4 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Elstree Substation, Hilfield Lanebattery storage400application withdrawn3.1
Hilfield Solar arrays & Battery storagesolar farm49.9application withdrawn3.3
Hilfield Lane, Aldenhambattery storage170approved, not built3.4
Wrotham Parksolar farm30application submitted5.4
Land At Swanland Roadsolar farm5operational6.7
Tollgate Farm, Welham Green Solar Farmsolar farm16application submitted7.5
Beechtree Junction, Potters Crouchsolar farm49.9application submitted7.8
Dellsome Power Hatfield Grid Station Energy storage facilitybattery storage5approved, not built7.9
Tollgate Farm Battery Storagebattery storage49.5under construction8.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.684, -0.3177).