Clawddcam-Mathry Solar Farm (7.5 MW)
Clawddcam-Mathry Solar Farm is a 7.5 MW solar farm project in Pembrokeshire, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: abandoned; the record was last updated on 19 February 2019.
7.5 MWsolar farm
abandonedstatus in REPD
19 February 2019record last updated
Pembrokeshirecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 31 May 2012 | Application submitted |
| 16 December 2013 | Planning permission granted |
| 16 December 2018 | Permission expired |
Project details
- Technology
- solar farm
- Capacity
- 7.5 MW
- Status (REPD)
- abandoned
- Record last updated
- 19 February 2019
- Operator or applicant
- Ms Power Projects Ltd
- Planning authority
- Pembrokeshire
- Planning application reference
- 12/0162/PA
- Address (REPD)
- Haverfordwest
- Council area (by location)
- Pembrokeshire
- Time to decision
- 81 weeks
- REPD reference
- 1597
Who decides
| Applications | Pembrokeshire | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 61 | 10,236 |
| Refused | 13 (21%) | 19% |
| Solar refused | 1 of 31 | 12% |
| Onshore wind refused | 11 of 16 | 45% |
| Battery storage refused | 1 of 14 | 16% |
| Median time from submission to decision | 23.9 weeks | 17.0 weeks |
| Appeals lodged / allowed | 2 / 3 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Jordanston Wind Farm | wind farm | 9.8 | refused | 6.0 |
| Trecoed Farm | solar farm | 8.9 | permission expired | 6.2 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.9186, -5.0883).