Jordanston Wind Farm (9.8 MW)
Jordanston Wind Farm is a 9.8 MW wind farm project in Pembrokeshire, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 1 September 2001; the record was last updated on 4 July 2001.
9.8 MWwind farm
refusedstatus in REPD
4 July 2001record last updated
Pembrokeshirecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 30 September 1997 | Application submitted |
| 1 September 2001 | Refused by the planning authority |
Project details
- Technology
- wind farm
- Capacity
- 9.8 MW
- Status (REPD)
- refused
- Record last updated
- 4 July 2001
- Operator or applicant
- RWE npower
- Planning authority
- Pembrokeshire
- Planning application reference
- 97/520
- Address (REPD)
- Land at Jordanston south of Fishguard Dyfed
- Council area (by location)
- Pembrokeshire
- Time to decision
- 205 weeks
- REPD reference
- 2640
Who decides
| Applications | Pembrokeshire | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 61 | 10,236 |
| Refused | 13 (21%) | 19% |
| Solar refused | 1 of 31 | 12% |
| Onshore wind refused | 11 of 16 | 45% |
| Battery storage refused | 1 of 14 | 16% |
| Median time from submission to decision | 23.9 weeks | 17.0 weeks |
| Appeals lodged / allowed | 2 / 3 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Trecoed Farm | solar farm | 8.9 | permission expired | 0.7 |
| Clawddcam-Mathry Solar Farm | solar farm | 7.5 | abandoned | 6.0 |
| Trenewydd Wind Farm | wind farm | 6.3 | refused | 8.4 |
| Cilciffeth 'A' Wind Farm | wind farm | 7.8 | refused | 8.4 |
| Cilciffeth 'B' Wind Farm | wind farm | 7.8 | refused | 8.7 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.9548, -5.0241).