Cilciffeth 'B' Wind Farm (7.8 MW)
Cilciffeth 'B' Wind Farm is a 7.8 MW wind farm project in Pembrokeshire, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 1 October 1999; the record was last updated on 14 April 2005.
7.8 MWwind farm
refusedstatus in REPD
14 April 2005record last updated
Pembrokeshirecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 1 February 1999 | Application submitted |
| 1 October 1999 | Refused by the planning authority |
Project details
- Technology
- wind farm
- Capacity
- 7.8 MW
- Status (REPD)
- refused
- Record last updated
- 14 April 2005
- Operator or applicant
- South Wales Power / SWALEC / National Windpower
- Planning authority
- Pembrokeshire
- Planning application reference
- not recorded
- Address (REPD)
- Mynydd Cilciffeth near Fishguard Dyfed
- Council area (by location)
- Pembrokeshire
- Time to decision
- 35 weeks
- REPD reference
- 2646
Who decides
| Applications | Pembrokeshire | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 61 | 10,236 |
| Refused | 13 (21%) | 19% |
| Solar refused | 1 of 31 | 12% |
| Onshore wind refused | 11 of 16 | 45% |
| Battery storage refused | 1 of 14 | 16% |
| Median time from submission to decision | 23.9 weeks | 17.0 weeks |
| Appeals lodged / allowed | 2 / 3 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Trenewydd Wind Farm | wind farm | 6.3 | refused | 0.3 |
| Cilciffeth 'A' Wind Farm | wind farm | 7.8 | refused | 0.3 |
| Ambleston Solar Panels | solar farm | 6 | operational | 6.6 |
| Trecoed Farm | solar farm | 8.9 | permission expired | 8.1 |
| Jordanston Wind Farm | wind farm | 9.8 | refused | 8.7 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.9553, -4.8975).